Deep-foundation-pit high-pressure-bearing well and construction method thereof

A high-pressure, deep foundation pit technology, applied in the field of high-pressure water wells, can solve the problems of reducing the drainage efficiency of cement gravel filter pipes, clogging of filter cloth or brown mesh, and easy clogging of brown mesh, etc., to improve convenience , good firmness and convenient construction

Active Publication Date: 2020-11-24
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the commonly used foundation pit dewatering wells mainly include cement gravel water filter pipes, and filter cloth or brown mesh is laid on the outside, but during the precipitation process under the condition of silt and fine sand stratum, fine silt particles can easily block the brown mesh Especially in the large-scale foundation pit precipitation of subway stations, due to the long precipitation cycle, the filter cloth or brown mesh will be blocked and rotted in the later stage, which seriously reduces the precipitation efficiency of the cement gravel filter pipe

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Deep-foundation-pit high-pressure-bearing well and construction method thereof
  • Deep-foundation-pit high-pressure-bearing well and construction method thereof
  • Deep-foundation-pit high-pressure-bearing well and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0056] In order to make the technical solution of the present invention clearer, the present invention will be further described below in conjunction with the accompanying drawings. Any solution obtained by equivalent replacement and conventional reasoning of the technical features of the technical solution of the present invention falls within the protection scope of the present invention.

[0057] As shown in the figure, a deep foundation pit high pressure water well includes a water well main body 1, a well pipe 2 is arranged in the water well main body, and the well pipe is fixed on the inner wall of the water well main body through a supporting mechanism 3; the water well main body includes coaxially arranged For the upper well body 101 and the lower well body 102, the inner diameter of the upper well body is larger than the inner diameter of the lower well body, a primary packing 103 is filled between the lower well body and the well pipe, and a secondary packing 104 is fi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a deep-foundation-pit high-pressure-bearing well and a construction method thereof. The deep-foundation-pit high-pressure-bearing well comprises a well main body, wherein a wellpipe is arranged in the well main body, and the well pipe is fixed to the inner wall of the well main body through a supporting mechanism; the well main body comprises an upper well body and a lowerwell body which are coaxially arranged, the inner diameter of the upper well body is larger than that of the lower well body, the space between the lower well body and the well pipe is filled with first-level filler, the space between the upper well body and the well pipe is filled with second-level filler, and a well lid is arranged at the top of the well main body; the well pipe comprises a bottom end cover, a filter pipe and a drainage pipe from bottom to top, the bottom end cover and the filter pipe are locked and fixed through fastening bolts, the filter pipe and the drainage pipe are fixed through fasteners, and the sum of the height of the bottom end cover and the height of the filter pipe is smaller than the depth of the lower well body; and according to the deep-foundation-pit high-pressure-bearing well, the pressure bearing capacity of the well is improved, construction is convenient, stability is good, and safety is high.

Description

technical field [0001] The invention relates to a high pressure water well, in particular to a deep foundation pit high pressure water well and a construction method thereof. Background technique [0002] With the rapid development of urbanization, rail transit and high-rise buildings are becoming more and more popular, and the construction of deep foundation pits will become a normal trend. In these projects, the treatment of groundwater is the first problem to be faced. Due to the dewatering requirements of the confined aquifer in the foundation pit or the anti-surge demand of the base, the decompression and dewatering well in the foundation pit is already a common way of dewatering, but often under high water head pressure, the plugging of the high water pressure dewatering well is another problem. In the later period, how to solve the blockage problems such as large diameter of precipitation well, high water level and rapid surge have become problems that modern buildin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D19/06E02D19/10B01D24/20
CPCB01D24/20E02D19/06E02D19/10
Inventor 付相宇解同得刘健许国涛张春辉张金凯
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP