Construction Technology of Synthetic Support for Grid Structure
A construction technology and grid structure technology, applied in the direction of truss structure, structural elements, elongated structural members for load-bearing, etc., can solve the problems of low construction efficiency of comprehensive supports and achieve the effect of improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as Figure 1-5 As shown, the embodiment of the present invention provides a comprehensive support for grid structure, including a cross arm 1 and a column 2, the two ends of the column 2 are fixedly connected with connecting steel plates 5, and the connecting steel plate 4 is provided with four through holes, the bottom of the column 2 A U-shaped clip 8 is provided, and the cross arm 1 and the column 2 are fixedly connected through the connecting steel plate 5 and the U-shaped clip 8 , and the upper end of the column 2 is fixedly connected with a connecting piece 4 .
[0040] The connecting piece 4 includes a string ball 7, the lower end of the string ball 7 is fixedly connected with the fixing piece 6, the lower end of the fixing piece 6 is fixedly connected with the connecting steel plate 5, the connecting piece 5 and the column 2 are fixedly connected by bolts and nuts, and the connecting piece 4 has two layers The connecting pipe 3 is arranged between the strin...
Embodiment 2
[0042] The construction technology of the comprehensive support of the grid structure includes the following steps:
[0043] Sp1 load calculation optimization
[0044] Based on the design drawings, according to the application scenario of the integrated support, adjust and optimize the size of the cross arm 1 and the column 2, and calculate the stress, shear stress and deflection of the optimized integrated support, and compare the design data values to meet the requirements , then the optimization is passed, both the cross arm 1 and the column 2 are made of square tube steel, if the square side length of the square tube steel section used by the cross arm 1 or the column 2 is 100mm, you can try it, and use the square side of the tube steel section The length is 80mm, and the thickness of the pipe wall remains unchanged. At the same time, check whether it meets the requirements of design strength and safety level;
[0045] This method was adopted in the construction of one ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


