Construction period assignment, order reception and production scheduling integrated optimization method
A technology for production scheduling and optimization methods, which can be used in instruments, commerce, buying and selling/lease transactions, etc., and can solve problems such as simultaneous decision-making
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] see figure 1 , based on the IDOS_PPE integrated optimization method, is divided into the following parts:
[0065] 1. Analyzed the nature of the delivery date in the case of fixed scheduling and gave the optimal delivery date configuration strategy;
[0066] Manufacturers need to specify an effective scheduling plan for customers and assign a reasonable duration, otherwise, the delivery of prefabricated components will be delayed and customer satisfaction will be reduced due to improper production scheduling. However, the enumeration method to determine the delivery time will greatly increase the calculation time. For this practical problem, in the case of a given scheduling sequence, the following properties can be obtained.
[0067] NR j represents the net profit of order j, γ j Indicates the customer satisfaction coefficient, Q j Gross profit of order j, w j is the delay penalty coefficient per unit time of order j, d j initial default lead time for order j, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com