Semi-submersible wind power generation foundation platform and mounting method thereof
A technology for wind power generation foundation and wind power generation unit, which is applied in the directions of wind power generation, installation/support of wind turbine configuration, anchoring arrangement, etc. The effect of low maintenance cost, convenient installation and lower construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Such as figure 1As shown, the semi-submersible wind power generation basic platform includes a basic structure platform, a wind turbine tower 4, a wind turbine 5, an umbilical cable 9 and a positioning system; the basic structure platform includes a column 1, a horizontal floating tank 2, and a central floating tank 3. Connect the buoyancy tank 6 and the heave plate 7. The central buoyancy tank 3 on the top of the basic structure platform is connected to the fan tower 4, and the top of the basic structure platform supports the facilities for controlling the balance device. Three columns 1 are perpendicular to the water surface, and the column 1 A horizontal buoyant tank 2 is provided between the central buoyant tank 3, and the lower parts of the three columns 1 are connected by connecting buoyant tanks 6. The bottom of the basic structure platform is in the form of an equilateral triangle, and the bottom of the central buoyant tank 3 is connected to the umbilical cord co...
Embodiment 2
[0053] Such as Figure 9 As shown, the installation method of the semi-submersible wind power generation base platform includes the following steps:
[0054] S1. As the anchoring device 10 at the bottom of the anchor chain (anchoring system 8), drive-in piles or suction anchors are used in advance.
[0055] S2. After the driven pile or suction anchor is installed, the anchor chain and cable are arranged on the seabed along the predetermined route. After the laying of the anchor chain is completed, the corresponding signs are made and the cable is discarded.
[0056] S3. The basic structure platform is built in the dock, and the basic structure platform is automatically floated out of the dock after it is built.
[0057] S4. Use a crane to install the wind turbine tower 4, the nacelle and the wind rotor (wind turbine 5) on the bank, and connect with the basic structure platform to form the foundation of the wind turbine.
[0058] S5. When the installed fan foundation is at a ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com