Simple and convenient tailing pond dam break simulation device
A technology of simulation device and tailings pond, applied in the direction of hydraulic model, etc., can solve problems such as difficult control, single function, easy deformation of water tank slope, etc., and achieve the effect of saving site space, simplifying structure, and facilitating experimental operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] A simple tailings pond dam failure simulation device, including a box body 1, a bearing plate 2, a detachable water stabilization device 3, a Doppler ultrasonic flowmeter I4, a tailings dam model 5, a Doppler ultrasonic flowmeter II6, Baffle plate 7, first rotating shaft 8, second rotating shaft 9, adjustable pillar I10, supporting pillar 11, differential gear set 12, filter screen 13, adjustable pillar II14, water pump 15, camera 16 and spraying device 17,
[0028] The two long sides and one short edge of the load-bearing plate 2 are provided with anti-seepage sealing strips, the load-bearing plate 2 is horizontally arranged in the middle position inside the box body 1, and the load-bearing plate 2 is connected to the box body 1 through the anti-seepage water sealing strip. Movable sealing connection, there is a gap between the other short side of the bearing plate 2 and the box body 1, and the upper part of the bearing plate 2 is sequentially provided with a detachable...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


