A green mine construction planning method based on real 3D modeling

A technology of 3D modeling and 3D modeling, applied in 3D modeling, details involving 3D image data, instruments, etc., to achieve intuitive scientific evaluation support and improve efficiency

CN112307552BActive Publication Date: 2022-07-01GEZHOUBA YIPULI XINJIANG BLASTING ENG CO LTD
7 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Publication Date
2022-07-01

Smart Images

  • Figure 1
    Figure 1
Patent Text Reader

Abstract

The invention discloses a green mine construction planning method based on real scene three-dimensional modeling, which includes acquiring geographic data of a target area, constructing a point cloud model and a TIN model, constructing a three-dimensional real scene model of original landform, constructing a three-dimensional real scene model of mining planning in a mining area, and constructing an ecological Fixed steps to plan a realistic 3D model. Preferably, when there is a hidden danger of geological disasters in the mine, before the step of constructing the three-dimensional model of the ecological restoration plan, it also includes constructing a three-dimensional model of the disaster control plan in the mining area. The beneficial effect of the present invention is that, by comprehensively utilizing the UAV oblique photography technology and the three-dimensional geographic information software platform, the two-dimensional plane design is converted into a three-dimensional three-dimensional model, the design model is integrated with the actual three-dimensional model of the current situation, and the mining and staged mining are restored to green. , geological disaster control, and post-mining ecological restoration design plans are truly presented in the 3D model of the real scene, providing objective and intuitive scientific evaluation support for the construction of green mines.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the field of green mine construction, in particular to a green mine construction planning method based on three-dimensional modeling of real scenes. Background technique

[0002] Green mine construction refers to the implementation of scientific and orderly mining in the whole process of mineral resource development, controlling the disturbance of the mining area and surrounding ecological environment within a controllable range, and realizing the ecological environment of the mining area, scientific mining methods, and efficient resource utilization. A mine that is standardized, standardized in enterprise management and harmonious in the mining community. However, in the process of mine construction in my country, many mining enterprises are extensive mining, and the problems of poor mining appearance, many hidden dangers of geological disasters, and the incongruity between the mining environment and the surrounding environmen...

Examples

Embodiment Construction

[0022] The present invention will be further described below in conjunction with the accompanying drawings, but the present invention is not limited to the scope of the described embodiments.

[0023] see figure 1 , a green mine construction planning method based on real 3D modeling, comprising the following steps;

[0024] The first step is to obtain the geographical data of the target area: define the area where the green mine project is located as the target area, and collect the geographical information of the target area according to the requirements to obtain the geographical information of the target area;

[0025] The second step is to construct a point cloud model and a TIN model: import the obtained geographic information into the 3D software, and after generating the 3D model, mark the position coordinates of the target area on the 3D model to obtain the point cloud model of the target area, and use the Convert point cloud model to TIN model;

[0026] The third st...