Embodiment 1
[0031] This embodiment provides a real-time monitoring system for leakage of water in the joints of shield tunnel segments, which is arranged inside the waterproof layer of the segment 1, and the waterproof layer is arranged at the circumferential joints and longitudinal connections between adjacent segments 1. Seam. like figure 1 As shown, the segments 1 are connected in the circumferential direction to form a ring, and a plurality of rings form a hollow cylindrical structure in the longitudinal direction.
[0032] Further, the segments 1 are inserted longitudinally through the longitudinal ribs 2 and the matching longitudinal rib holes. The waterproof layer is made of waterproof coiled material. In order to fully ensure the waterproof effect of the waterproof layer, the waterproof layer must be closely overlapped; that is, the waterproof layers at the circumferential joints and longitudinal joints are overlapped with each other.
[0033] The two ends of the segment 1 are r...
Embodiment 2
[0043] This embodiment provides a method for real-time monitoring of leakage water in the joints of shield tunnel segments. First, the real-time monitoring system for leakage water is installed in the waterproof layer between the shield tunnel segments. Specifically, the first weak current wire 9, the weak current wire bundle 8, and the second weak current wire 7 are arranged at the circumferential connection seam position of the segment 1, and the first weak current wire 9 and the weak current wire bundle 8 The conductive cotton thread 5 meeting water is arranged at intervals.
[0044] The third weak current wire 13, the fourth weak current wire 14 and the electrode 10 are fixed at the longitudinal connecting seam of the segment 1, one end of the third weak current wire 13 and the fourth weak current wire 14 is connected to the water conductive cotton thread 5, and the other end is connected through the electrode 10 The second weak current wire 7.
[0045] The segment 1, the...