An operation method for quickly recovering main insulation breakdown of tubular busbar
A fast recovery and operation method technology, applied in the installation of busbars, fully enclosed busbar devices, insulation/armoured cable repair equipment, etc., can solve the problem of inability to add additional intermediate joints, easy insulation breakdown of busbars, time-consuming removal and installation Problems such as labor consumption, to achieve the effect of saving manpower, material and financial resources, high mechanical strength and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
no. 1 approach
[0047] The first embodiment of the present invention relates to an operation method for rapidly recovering the main insulation breakdown of a tubular busbar, comprising the following steps:
[0048] S1. Find the insulation breakdown point, and check and analyze the damage degree of the fault, confirm that the main insulation layer of the tubular busbar has been damaged, and the conductor is not damaged, and proceed to the next step;
[0049] S2. Disconnect the flexible connections of the low-voltage side of the main transformer, the high-voltage switchgear and the tubular busbar respectively, and remove the sealing wall plate and the fixing fittings of the tubular busbar at the place to be repaired;
[0050] S3. Pre-treatment of the insulation breakdown point of the tubular busbar;
[0051] S4. Wrap the semiconductor nylon tape;
[0052] S5. Wrap copper tape;
[0053] S6. Wrap 3M stress control tape;
[0054] S7. Restore the insulation at the breakdown point of the tubular ...
no. 2 approach
[0060] The operation method for quickly recovering the main insulation breakdown of the tubular busbar provided by this embodiment includes the following steps:
[0061] S1. Find the insulation breakdown point, and check and analyze the damage degree of the fault, confirm that the main insulation layer of the tubular busbar has been damaged, and the conductor is not damaged, and proceed to the next step;
[0062] S2. Disconnect the flexible connection of the low-voltage side of the main transformer, the high-voltage switch cabinet and the tubular busbar respectively, and remove the sealing wall plate and the fixing fittings of the tubular busbar at the place to be repaired;
[0063] S3. Pre-treatment of the insulation breakdown point of the tubular busbar, including:
[0064] S301, peel off the outer sheath layer on both sides of the insulation breakdown point to expose the copper shielding layer;
[0065] The stripping length of the outer sheath layer on both sides of the insu...
no. 3 approach
[0081] The operation method for quickly recovering the main insulation breakdown of the tubular busbar provided by this embodiment includes the following steps:
[0082] S1. Find the insulation breakdown point, and check and analyze the damage degree of the fault, confirm that the main insulation layer of the tubular busbar has been damaged, and the conductor is not damaged, and proceed to the next step;
[0083] S2. Disconnect the flexible connections of the low-voltage side of the main transformer, the high-voltage switchgear and the tubular busbar respectively, and remove the sealing wall plate and the fixing fittings of the tubular busbar at the place to be repaired;
[0084] S3. Pre-treatment of the insulation breakdown point of the tubular busbar, including:
[0085] S301, peel off the outer sheath layer on both sides of the insulation breakdown point to expose the copper shielding layer;
[0086] The stripping length of the outer sheath layer on both sides of the insul...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More