Viaduct cross-ground parallel bridge buttress full framing combined support and construction method thereof
A construction method and combined support technology, which is applied in the direction of erecting/assembling bridges, bridges, bridge parts, etc., can solve problems such as construction difficulties of upper-span cast-in-place box girder bridges, and achieve the effect of avoiding damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] see image 3 , the present invention provides a construction method for viaduct cross-ground plane-parallel bridge piers full of combined supports, please refer to Figure 1-Figure 2 , specifically include the following steps:
[0030] Step 1: Construction preparation: Combined with the plane layout of the bridge on the ground, formulate the construction plan for the combined support of the cast-in-place box girder pier of the viaduct; the temporary pier 6 of the bridge face is arranged directly above the abutment and pier column of the bridge on the ground, and the upper load is carried by the bridge deck The temporary buttress 6 is directly transmitted to the ground bridge cover beam 4 and the bridge pier cap 3 to the foundation, so as to avoid the beam slab from participating in the overall stress. to 9m) to determine the number of steel pipe pile 1 foundations (1 to 6, and the distance between multiple piles in a single row should not be greater than 1.5m).
[003...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com