Vibro-replacement stone pile composite foundation detection device
A technology of vibrating gravel piles and composite foundations, which is applied in foundation structure engineering, foundation structure testing, construction, etc., and can solve the problem that testing equipment cannot fully detect the firmness of gravel piles, and the inspection and fixing ropes are inconvenient to store and affect the detection. Accuracy of results and other issues to achieve the effect of improving coordination and flexibility, accurate test results, and avoiding winding
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] A vibratory crushed stone pile composite foundation detection device, such as Figure 1-2As shown, including the base 1, the four corners of the lower end of the base 1 are fixedly connected with the moving wheels 2, and the four corners of the upper end of the base 1 are fixedly connected with the support columns 3, and the limit mechanism 10 is fixedly installed between the two support columns 3 at the front. A connection horizontal plate 14 is fixedly connected between the two support columns 3 on the right side, and the left end of the connection horizontal plate 14 is fixedly installed with a take-up reel 11, and the upper ends of the four support columns 3 are jointly fixedly installed with an upper support platform 4, and the upper support platform 4. There is a rectangular slot 5 that passes through up and down in the middle of the upper end. A horizontal movement device 6 is fixedly installed at the rear of the upper end of the upper support platform 4. A vertic...
Embodiment 2
[0037] On the basis of Example 1, as Figure 3-6 As shown, a vibrating gravel pile composite foundation detection device includes a base 1, the four corners of the lower end of the base 1 are fixedly connected with moving wheels 2, and the four corners of the upper end of the base 1 are fixedly connected with supporting columns 3. The limit mechanism 10 is fixedly installed between the supporting columns 3, and the connecting horizontal plate 14 is fixedly connected between the two supporting columns 3 on the right side, and the left end of the connecting horizontal plate 14 is fixedly installed with a take-up reel 11, and the upper ends of the four supporting columns 3 An upper support platform 4 is fixedly installed together, and the middle part of the upper end of the upper support platform 4 is provided with a rectangular slot 5 that penetrates up and down. Vertical moving device 7, and vertical moving device 7 is positioned at below lateral moving device 6, and guide fram...
Embodiment 3
[0040] On the basis of Example 1, as Figure 7-8 As shown, a vibrating gravel pile composite foundation detection device includes a base 1, the four corners of the lower end of the base 1 are fixedly connected with moving wheels 2, and the four corners of the upper end of the base 1 are fixedly connected with supporting columns 3. The limit mechanism 10 is fixedly installed between the supporting columns 3, and the connecting horizontal plate 14 is fixedly connected between the two supporting columns 3 on the right side, and the left end of the connecting horizontal plate 14 is fixedly installed with a take-up reel 11, and the upper ends of the four supporting columns 3 An upper support platform 4 is fixedly installed together, and the middle part of the upper end of the upper support platform 4 is provided with a rectangular slot 5 that penetrates up and down. Vertical moving device 7, and vertical moving device 7 is positioned at below lateral moving device 6, and guide fram...
PUM
Login to View More Abstract