Rainy season roadbed earthwork construction structure and construction method thereof
A technology for earthwork and roadbed, which is applied to the construction structure of roadbed earthwork and its construction field in rainy season, can solve the problems of many debris in the filter box, inconvenient cleaning of the filter box, blockage of the drainage pipe, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] The following is attached Figure 1-8 The application is described in further detail.
[0045] The embodiment of the present application discloses a construction structure of subgrade earthworks in rainy season, such as figure 1 and figure 2 As shown, including the drainage pipe 2 poured in the settlement well 1, the staff can enter and exit the settlement well 1 through a ladder, the drainage pipe 2 is connected with the municipal pipeline 3, the drainage pipe 2 is square, and the inside of the drainage pipe 2 slides along its length direction Connected with a filter frame 4, the filter frame 4 is detachably connected with a filter plate 41, the filter plate 41 is square, and one end of the drain pipe 2 is installed with a drive device 5 for driving the filter frame 4 to move, and the filter frame 4 is far away from the drive device 5 One end is equipped with a cleaning device 6 for cleaning the inner wall of the drain pipe 2 , and the cleaning device 6 includes a r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap