Tower section temporary operation platform and construction method

A technology for working platforms and tower joints, which is applied in the direction of building structure support, building structure support, building structure support scaffolding, etc., and can solve the problems of time-consuming and labor-intensive installation of temporary work platforms

Inactive Publication Date: 2021-05-18
CHINA ELEVENTH CHEM CONSTR
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a temporary operating platform for tower sections and a construction method to solve the technical problem of time-consuming and laborious installation of temporary operating platforms in the prior art to a certain extent

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tower section temporary operation platform and construction method
  • Tower section temporary operation platform and construction method
  • Tower section temporary operation platform and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Apparently, the described embodiments are some of the embodiments of the present invention, but not all of them.

[0033] The components of the embodiments of the invention generally described and shown in the figures herein may be arranged and designed in a variety of different configurations. Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention.

[0034] Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0035] In the description of the present invention, it should be noted that the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Widthaaaaaaaaaa
Thicknessaaaaaaaaaa
Login to View More

Abstract

The invention relates to the technical field of chemical tower equipment aerial operation platforms, and particularly relates to a tower section temporary operation platform and a construction method. The tower section temporary operation platform comprises a mounting ring plate, cantilever beams and fences, wherein the mounting ring plate can sleeve and tightly hoop a tower section to serve as a rooting part of the temporary operation platform; a plurality of cantilever beams are provided, and are arranged in the peripheral direction of the tower section at intervals; one ends of the plurality of cantilever beams are detachably connected to the mounting ring plate, and the other ends of the plurality of cantilever beams extend in the radial direction of the tower section; and steel springboards can be paved on the cantilever beams for constructors to stand on the temporary operation platform. The fences are arranged between any two adjacent cantilever beams, and are detachably connected with the tail ends, far from the tower section, of two adjacent cantilever beams. All parts of the temporary operation platform are detachably connected, so that operators can quickly finish installation and disassembly of all parts to improve the construction efficiency.

Description

technical field [0001] The application relates to the technical field of high-altitude operation platforms for chemical tower equipment, in particular to a temporary operation platform for tower sections and a construction method. Background technique [0002] At present, the installation of large or super-large (including 60m and above, weighing more than 200 tons) chemical towers, due to the heavy equipment, the existing hoisting machinery cannot be installed as a whole, or the overall installation requires a larger hoisting machinery, cost Higher; this causes the tower equipment to be installed in sections. Generally, the tower body is divided into two or three sections according to the capacity of the hoisting machinery, and the tower sections need to be welded in the air between the tower sections. [0003] During butt welding, it is necessary to set up a temporary work platform at the position 1m below the position of the butt welding joint, so that the operators can s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G3/18E04G3/24E04G5/04E04G5/14E04G5/00
CPCE04G3/18E04G3/243E04G5/04E04G5/14E04G5/00E04G5/007
Inventor 张永昌刘胜峰娄战士
Owner CHINA ELEVENTH CHEM CONSTR