Method for predicting tidal estuary water level process
A prediction method and water level technology, applied in water conservancy engineering, water conservancy engineering equipment, instruments, etc., can solve the problems of insufficient forecasting accuracy and representativeness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] like figure 1 As shown, a method for predicting the water level process of a tidal estuary, the method includes the following steps:
[0039] Step 1: Collect hourly water level data from water level measuring stations in the estuary area for one month or more to form a "water level (η)-time (t)" relationship sequence, such as figure 2 As shown, through the harmonic analysis, the main semidiurnal equinox (M 2 ), solar main semidiurnal equinox (S 2 ) with amplitudes of 1.2m and 0.6m respectively.
[0040] Step 2: Collect topographic data and river flow data in the estuary area, and use them as boundary conditions and upstream input conditions for hydrodynamic simulation, and combine the "water level (η)-time (t)" relationship sequence of the water level measuring station in the estuary area to obtain the estuary area The "water level (η)-time (t)" relationship sequence at any position, specifically:
[0041]The model calculation area is set as the 600km long river se...
Embodiment 2
[0067] Embodiment two (technical effect comparison embodiment)
[0068] Image 6 For respectively showing the water level process predicted by the method of the present invention, the water level process predicted by the harmonic analysis method and the water level process obtained by actual measurement (ie Image 6 "raw sequence").
[0069] from Image 6 It can be clearly seen from the figure that there is a big difference between the water level process based on the harmonic analysis and the measured water level process, which is reflected in the time mismatch between the corresponding peaks or peaks and valleys of the two, and there is a difference of 2-3m in the specific water level values. In contrast, the prediction process of the method of the present invention is basically consistent with the measured water level process, which proves that the method of the present invention has the technical effect of improving the prediction accuracy of the water level process.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com