Construction Control Method of Bridge Steel Tube Arch Rib
A technology of steel pipe arch ribs and control methods, applied in the direction of bridges, bridge forms, bridge construction, etc., to achieve the effect of ensuring smooth progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0070] A construction control method for bridge steel pipe arch ribs, including:
[0071] (1) Establish a three-dimensional model of arch rib segments and number the arch rib segments sequentially;
[0072] (2) Before hoisting the arch rib segment, the temperature measurement of the arch rib segment is carried out, and the actual position of the arch rib segment is measured after the hoisting of the arch rib segment is completed, and the installation interval of the arch rib segment is recorded;
[0073] (3) In the three-dimensional model of arch rib segment, the deformation of arch rib segment after installation is calculated by the steady-state temperature field expression of arch rib segment, and the minimum time period of arch rib segment deformation is predicted according to the meteorological and hydrological data of the construction site;
[0074] (4) According to the deformation data, the expected time of Helong and the position size of Helongkou are obtained, and then the...
example
[0085] (1) Project overview
[0086] The angle between the head and tail of the steel pipe arch bridge of a four-limb truss is 15°; the main hole calculates the span diameter of 560m, and the radial height of the vault section is 8.5m; the radial height of the arch foot section is 17m, the rib width is 4.2m, and each rib is two φ1400mm steel tube concrete string pipes. The arch ribs of the bridge are divided into two sides of the south bank and the north bank, and each side is divided into 11 arch rib sections. The façade of the bridge is as follows Figure 1 as shown.
[0087] (2) Temperature monitoring
[0088] On April 9, 2020, the bridge measured the temperature of some sections of the arch rib section after the arch ribs were closed, and collected the temperature of the left lower chord of the 6# arch rib section upstream of the north shore, the left left side of the left upper left of the 1# arch rib on the south bank, the left left of the left upper left of the 8# arch rib o...