Comprehensive test device and comprehensive test method for primary power distribution device

A comprehensive test and power distribution device technology, applied in the direction of measuring devices, measuring electricity, measuring electrical variables, etc., can solve potential safety hazards, fail to meet the requirements of pre-installation calibration of products to be tested, and cannot guarantee the quality of products to be tested after installation, etc. problems, to achieve the effects of easy operation, improvement of system test efficiency and quality, and efficient test methods

CN113219270AInactive Publication Date: 2021-08-06CHENGDU AIRCRAFT INDUSTRY GROUP
4 Cites 2 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2021-08-06
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention belongs to the technical field of power distribution tests, and particularly relates to a comprehensive test device and method for a primary power distribution device, the comprehensive test device comprises a control unit, a power supply unit and a load unit, and the control unit comprises a KVM assembly, a test host and an interface conditioning box which are in communication connection in sequence; the interface conditioning box is electrically connected with a signal interface box used for providing a signal acquisition interface and a power switching device used for supporting common loading of a plurality of channels, and the output end of the power switching device is electrically connected with a power interface box used for providing a power supply / load interface. According to the invention, functions and performance of a tested product can be comprehensively tested, whether each test item is qualified or not can be rapidly judged, the test mode is efficient and accurate, the safety and reliability of use of a primary power distribution device are better guaranteed, the direct installation of a fault product is avoided, the system test efficiency and quality of aircraft assembly are improved, and the aircraft accident rate is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of power distribution test, and in particular relates to a comprehensive test device and a comprehensive test method of a primary power distribution device. Background technique

[0002] With the rapid development of electronic technology, my country's aviation airborne power distribution system devices tend to be comprehensive and intelligent, and the power distribution system of modern aircraft is developing towards electrical multiplex transmission systems. The traditional single power distribution device test method has been unable to adapt to the detection of new power distribution devices.

[0003] The power distribution system is the key component system of the aircraft power supply system. It is composed of wires, power distribution devices and protection devices, etc., and is used to transmit the electric energy generated by the power supply to the electrical equipment. The primary power distributio...

Examples

Embodiment 1

[0027] This embodiment discloses a comprehensive test device for a primary power distribution device, including a control unit, a power supply unit for providing a step-down test power supply to a product under test and an electronic device for providing a step-down test power supply to a product under test. The load unit of the load; the control unit includes a KVM component, a test host and an interface conditioning box that are sequentially connected by communication; the interface conditioning box is electrically connected with a signal interface box for providing a signal acquisition interface and a power switch for supporting common loading of several channels device, the output end of the power switching device is electrically connected to a power interface box for providing a power supply / load interface; the power supply unit and the load unit are respectively electrically connected to the power switching device, and the power supply unit is electrically connected to the...

Embodiment approach

[0034] This embodiment discloses a comprehensive test method for a primary power distribution device, as a basic implementation of the present invention, including the following steps:

[0035] S1, connect the comprehensive test device, prepare a sufficient number of test cables, and use the test cables to connect the corresponding test interfaces on the product to be tested to the signal interface box and the power interface box respectively;

[0036] S2, turn on the power supply, connect the external power supply to the power supply unit and start the comprehensive test device, so that the product to be tested, the interface conditioning box and the test host are powered on in sequence;

[0037]S3, enter the test, enter the test interface of the test software through the KVM component, start the automatic test system program, and select the corresponding test item; specifically, the test item includes the control test of the SSPC, the test of the sampling resistance, and the ...

Embodiment 3

[0041] This embodiment discloses a comprehensive test method for a primary power distribution device. As a preferred embodiment of the present invention, it specifically relates to the control test of the SSPC of the product to be tested in the comprehensive test, including the following steps:

[0042] S1, connect the comprehensive test device, prepare a sufficient number of test cables, and use the test cables to connect the corresponding test interfaces on the product to be tested to the signal interface box and the power interface box respectively;

[0043] S2, turn on the power supply, connect the external power supply to the power supply unit and start the comprehensive test device. and the test host are powered on sequentially;

[0044] S3, enter the test, enter the test interface of the test software by the KVM component, start the automatic test system program, and select the control test item of the SSPC;

[0045] S4, start-up test: SSPC-based control test selection...