A construction method and a free technology, applied in the processing of building materials, floors, buildings, etc., can solve the problems that the filling material cannot be fixed in the shrinkage joint, the filling material is not elastic enough, and there is a gap between the filling material and the shrinkage joint.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0043] A construction method for a free-travel ultra-flat floor disclosed by the present invention comprises the following steps:
[0044] Step 1: Install the formwork for pouring on the ground, and lay steel bars at the edge of the column and wall, use steel bars to strengthen the edge of the formwork, and install extruded boards at the edge of the wall.
[0045] Step 2: Bind the steel bars and lay them on the ground. The steel bars are divided into two layers, including the upper layer of steel bars and the lower layer of steel bars. The upper and lower layers of steel bars are supported by steel stirrups. The distance between two adjacent stirrups is 1m.
[0046] Step 3: Handle the sub-warehouse joints: The sub-bin joints are treated with finished armored joint construction, which can prevent long-term forklift truck damage to the sub-warehouse joints.
PUM
Property | Measurement | Unit |
---|---|---|
Compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com