[0021] The technical solution adopted by the present invention to solve the technical problem is: a sludge continuous buffer system, including the first storage bin 1, the second storage bin 2, the first buffer bin 3, the second buffer bin 4 and the third buffer bin 5. The first sludge plunger pump pipe 6 and the second sludge plunger pump pipe 7 connected to the feed pipe 11 are respectively provided on the top of the first storage bin 1 and the second storage bin 2. The bottoms of the first storage bin 1 and the second storage bin 2 are respectively provided with a first discharge valve pipe 9 and a second discharge valve pipe 10 connected to the storage pipe 12, and a double helix is arranged on the feed pipe 11. feeder.
[0022] The sludge outside the factory is transported to the factory by truck, and through the feed pipe 11, under the action of the first sludge plunger pump pipe 6 and the second sludge plunger pump pipe 7 respectively, according to the amount of exter...
Embodiment 2
[0028] The technical solution adopted by the present invention to solve the technical problem is: a sludge continuous buffer system, including the first storage bin 1, the second storage bin 2, the first buffer bin 3, the second buffer bin 4 and the third buffer bin 5. The first sludge plunger pump pipe 6 and the second sludge plunger pump pipe 7 connected to the feed pipe 11 are respectively provided on the top of the first storage bin 1 and the second storage bin 2. The bottoms of the first storage bin 1 and the second storage bin 2 are respectively provided with a first discharge valve pipe 9 and a second discharge valve pipe 10 connected to the storage pipe 12, and a double helix is arranged on the feed pipe 11. feeder.
[0029] The sludge outside the factory is transported to the factory by truck, and through the feed pipe 11, under the action of the first sludge plunger pump pipe 6 and the second sludge plunger pump pipe 7 respectively, according to the amount of exter...