Applicability analysis method and system for steel structure production scheduling strategy
A technology of production scheduling and analysis method, applied in the direction of semantic analysis, system integration technology, information technology support system, etc., can solve the problems of reducing the professional dependence of production scheduling, so as to reduce the professional dependence, improve efficiency and reduce accidents risk effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The present invention will be further described in detail below in conjunction with specific embodiments.
[0047] It should be noted that these examples are only used to illustrate the present invention, rather than to limit the present invention, and the simple improvement of the method under the premise of the present invention all belongs to the protection scope of the present invention.
[0048] The present invention provides a method for applicability analysis of steel structure production scheduling strategy (refer to attached figure 1 ),include:
[0049] S1. Preprocess the original file of the existing steel structure production scheduling strategy, and then perform corpus annotation to obtain a standardized library;
[0050] Specifically, preprocessing the original file of the existing steel structure production scheduling strategy includes: using the original file of the existing steel structure production scheduling strategy, standardizing the text encoding ...