A polyurethane waterproofing and processing equipment technology, applied in polyurea/polyurethane coatings, coatings, feeding devices, etc., can solve the problems of affecting the reaction effect, not being able to be used, long dehydration time of polyurethane raw materials, etc., and achieve the effect of avoiding residues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Embodiment 1, with reference to attached Figure 1-11 , a kind of polyurethane waterproof coating production and processing equipment provided by the present invention, comprises reactor one 100, reactor two 200, feeding kettle 300 and workbench 400, and reactor one 100, reactor two 200 and feeding kettle 300 are arranged side by side in the working The top of platform 400 also includes: the pneumatic conveying device 270 installed on the top of reaction kettle 200 and the powder conveying device 330 installed on the inner wall of feeding kettle 300;
[0046] Pneumatic delivery device 270 includes:
[0047] The negative pressure tank 271 fixedly installed on the top of the reaction kettle 200, specifically, the top of the negative pressure tank 271 is fixedly equipped with a tee pipe 275, the left side of the negative pressure tank 271 is fixedly installed with a feed sleeve 273, and the inner wall of the negative pressure tank 271 is set There is a mesh column 278, th...
Embodiment 2
[0061] A kind of polyurethane waterproof coating production and processing technology: its processing flow is,
[0062] Step 1: Put the metered polyether into the reaction kettle 100 through the feed pipe 130 and the nozzle 110, start stirring through the stirring rod 220, and connect different cold and heat sources through the tank interlayer 250 for cyclic heating or Cool the reaction, heat up to above 100°C, turn on the vacuum pump 450 to drag the water from the reaction kettle 100, the vacuum degree reaches above 0.09, and lasts for 2 hours;
[0063]Step 2: Cool down to 54-56°C, add TDI according to the amount, turn off the vacuum pump 450 after the vacuum degree reaches 0.09, and raise the temperature by about 1-3°C per minute, when the temperature is not rising, heat up to 80°C and keep it for 2 hours, then cool down to 40°C °C, turn off the stirring rod 220, turn on the vacuum pump 450 to drag air for 15 minutes, and turn off the vacuum pump 450;
[0064] Step 3: While...