Dual-active bridge clamping converter and control method thereof
A dual active bridge and converter technology, applied in control/regulation systems, DC power input conversion to DC power output, instruments, etc., can solve the problems of reducing current peak value and effective value, not realizing standards, increasing control difficulty, etc. , to achieve the effect of expanding the adjustment range, enhancing flexibility, realizing precise control and optimizing efficiency modulation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] This embodiment introduces a dual active bridge clamp converter.
[0045] The topology of the traditional dual active bridge converter is as follows figure 1 As shown, this embodiment improves the topology of the converter on the basis of this, and adds a clamping branch. The improved topology is as follows figure 2 shown.
[0046] Such as figure 2 A dual active bridge clamp converter shown includes a primary full bridge circuit, a secondary full bridge circuit, a transformer and a clamping branch arranged between the primary full bridge circuit and the secondary full bridge circuit, specifically The topology is set up as follows:
[0047] The primary-side full-bridge circuit includes a first capacitor branch, a first bridge arm, and a second bridge arm connected in parallel, and the first capacitor branch includes a first capacitor C connected in series. 11 and a second capacitor C 12 (here the first capacitor C 11 and a second capacitor C 12 The capacitive re...
Embodiment 2
[0053] This embodiment introduces a control method based on the dual active bridge clamp converter introduced in the first embodiment.
[0054] A control method for a dual active bridge clamp converter, comprising the following steps:
[0055] Calculate the phase shift between the bridge arms of the primary side full bridge circuit and the secondary side full bridge circuit;
[0056] Control the conduction of the switching tube, the first switching tube, the second switching tube, the third switching tube, the fourth switching tube, the fifth switching tube, the sixth switching tube, the seventh switching tube, and the eighth switching tube by phase shifting and off, calculate the current at the first input terminal of the transformer;
[0057] Based on the obtained current at the first input of the transformer, calculate the current stress per unit of the dual active bridge clamped converter, the transmitted power of the dual active bridge clamped converter and the per unit ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| inductance | aaaaa | aaaaa |
| capacitance | aaaaa | aaaaa |
| electrical resistance | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



