[0026] Example: such as figure 1 As shown, a flow chart of a method for automatically generating a wiring construction scheme includes the following steps:
[0027] S1. Establish a three-dimensional terrain model through the survey data, and establish a working condition model on the three-dimensional terrain model; the working condition model includes a power tower model and a tower base model;
[0028] S2. Import the standard working condition data into the working condition model, determine the construction data according to the actual working condition data, and generate the wiring construction scheme;
[0029] The standard working condition data includes tower body attributes, connection medium attributes, and adjacent attributes; the tower body attributes include: tower base elevation, tower positioning height, and fitting string length; the connection medium attributes include wire specific gravity and line rotation angle ; The adjacency attributes include: the span sp...