BIM-based FM intelligent construction site operation and maintenance control system and method thereof
A management and control system, operation and maintenance technology, applied in 3D modeling, image data processing, resources, etc., can solve problems such as the inability to meet the needs of smart airports and non-stop construction, saving manpower and material resources, layout saving, and improving lighting effects. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0073] Refer to attached Figure 1~3 As shown, the present invention provides a technical solution: BIM-based FM intelligent construction site operation and maintenance management and control system, including a three-dimensional interactive management and control subsystem 100 and a construction site management and control subsystem 200, the three-dimensional interactive management and control subsystem 100 and the construction site Communication and interaction between the on-site management and control subsystems 200;
[0074] The three-dimensional interactive management and control subsystem 100 includes a design management module 110, a technology management module 120, a construction period management module 130, a quality management module 140 and an operation and maintenance management module 150;
[0075] Among them, the design management module 110 is used to receive design drawings and draw a BIM three-dimensional model, perform virtual rendering on the BIM three-di...
Embodiment 2
[0113] The embodiment of the present invention also discloses the management and control method of the FM intelligent construction site operation and maintenance management and control system based on BIM. Figure 4 shown, including the following steps:
[0114] S1, the design management module 110 receives design drawings and draws a BIM three-dimensional model, performs virtual rendering on the BIM three-dimensional model, and sends the BIM three-dimensional model to the technology management module 120 and the construction period management module 130 respectively;
[0115] S2, the technology management module 120 receives the BIM three-dimensional model sent by the design management module 110, and each participating party conducts office communication based on the same BIM three-dimensional model, and the construction period management module 130 is used to receive the BIM three-dimensional model of the design management module The progress plan divides the BIM three-dime...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


