A construction method and technology for shield tunneling, which are used in earth-moving drilling, wellbore lining, tunnel lining, etc., can solve the problems of loose segment, lower utilization rate of transverse passage, tilting of pile body, etc., and reduce wear and pile grinding time. Shortened, less loose effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the drawings in the embodiments of the present invention.
[0026] The embodiment of the present invention is realized like this, as Figure 1-4 The pile body construction method at the junction of the underground excavation station and the shield section includes:
[0027] S1. The first reinforced concrete pile 2 and the plain pile 3 under the section segment at the construction portal 1;
[0028] S2. Pour M5 mortar 5 on the top of the plain pile 3 and pour it to the inverted arch of the cross passage 7 (the crown beam on the top of the pile will not be constructed for the time being);
[0029] S3. Shield grinding piles enter the station, specifically the left-line shield passing station 61 and the right-line shield passing station 62;
[0030] S4. Digging holes to construct the second reinforced concrete pile 8 above the segment, a...