Optimization method and system for distributed prediction power grid

An optimization method and decentralized technology, applied in prediction, system integration technology, neural learning method, etc., can solve the problem of low reliability of distributed power planning, inability to control the adjustment accuracy of distributed power, and difficulty in quantitatively grasping distributed power. Adjustment volume and other issues to achieve the effect of improving accuracy and controllability and meeting low-carbon needs

Active Publication Date: 2021-12-07
GUANGDONG POWER GRID CO LTD DONGGUAN POWER SUPPLY BUREAU
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide an optimization method and system for distributed forecasting power grids to solve the problem that it is difficult to quantitatively grasp the adjustment amount of distributed power sources in the prior art, that is, it is impossible to control the adjustment accuracy of distributed power sources, which leads to distributed power technical problems of low planning reliability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimization method and system for distributed prediction power grid
  • Optimization method and system for distributed prediction power grid

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0059] Such as figure 1 As shown, the present invention provides a kind of optimization method of distributed prediction electric network, comprises the following steps:

[0060] Step S1. Real-time monitoring of the power supply parameters provided by each distributed power source in the distribution network for the distribution network load, and calculate the contribution degree of the distributed power source based on the power supply parameters, and the con...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an optimization method and system for distributed prediction power grid. The method comprises the following steps: S1, monitoring a power supply parameter provided for a power distribution network load by each distributed power supply in a power distribution network in real time, and calculating the contribution degree of the distributed power supply based on the power supply parameter; and S2, predicting the contribution degree of the distributed power supply at the future moment, and constructing a distribution model for the contribution degree of the distributed power supply in the power distribution network, wherein the distribution model is used for carrying out coordinated distribution on the contribution degree of the distributed power supply in the power distribution network, so that the distributed power supply meets the load power demand of the power distribution network, and meanwhile, the power consumption cost is reduced and the cleaning benefit is improved. The distributed power supplies are dynamically adjusted until the predicted value of the contribution degree obtained by the neural network at the future moment is consistent with the adjustment reference, so that optimal scheduling of all the distributed power supplies in the power distribution network is realized, and the power distribution network meets the low-carbon requirement while meeting the reliability requirement.

Description

technical field [0001] The invention relates to the technical field of power grid optimization, in particular to a distributed forecasting power grid optimization method and system. Background technique [0002] As countries around the world pay more and more attention to issues such as energy crisis, environmental protection, and global climate change, the development and utilization of renewable energy has become a global consensus and concerted action. In recent years, renewable energy power generation technology has become increasingly mature, and renewable energy power generation grid integration has developed rapidly. At the same time, electric vehicles have been widely researched and utilized due to their advantages of energy saving, environmental protection and air pollution prevention and control. The large-scale access and application of distributed power and electric vehicles is an inevitable trend and an important feature of the sustainable development of smart ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06G06N3/04G06N3/08
CPCG06Q10/04G06Q10/067G06Q50/06G06N3/08G06N3/044Y02E40/70Y04S10/50
Inventor 尹稚玲罗金满高承芳封祐钧叶睿菁张谊李晓霞刘飘王海吉
Owner GUANGDONG POWER GRID CO LTD DONGGUAN POWER SUPPLY BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products