Speed limit board system and speed limit board management system
A speed limit sign and speed limit technology, applied in the field of control, can solve problems such as driving safety hazards, speed limit exceeding 3 places, wrong speed limit sign insertion, etc., to improve operational safety, save labor costs, and improve construction efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] figure 1 A schematic structural diagram of a limited cell system provided by the embodiment of the present invention, such as figure 1 As shown, the limit cell system includes a control system 1 and a display system 2. Control system 1 is used to control the display of the display system 2.
[0052] figure 2 for figure 1 A schematic diagram of the control system 1 in the limit cell system, the control system 1 of the limit card includes the over-vehicle detection module 11, the control module 12, and the speed limit display detection module 13. image 3 for figure 1 A schematic diagram of the display system 2 in the speed limit system. The display system 2 includes a first rolling shaft 21, a motor 22, a curtain 23, a second roller 24, and an energy storage spring 25. Combine Figure 1 - Figure 3 Specifically, specific instructions for the limit speed system of the present application.
[0053] The speed limit display detection module 13 is used to obtain the current first ...
Embodiment 2
[0101] The present application also includes a speed limit card management system, which includes one or more limit speed card systems in the management server, a PC terminal, a handheld terminal, and an embodiment one.
[0102] Multiple restricted speed list systems, management servers, and multiple terminals, through network interconnection, constitute a speed-limit management system, implement management of rail construction management and limit cell system. By interacting with the server, one terminal can monitor, controlling the operation of multiple speed specifications, acquires the available cases of the alternate limit, and maintains a record, etc.
[0103] The management server obtains and records the operating status, running status, acquisition and record the vehicle passage during the temporary speed limit of each construction site.
[0104] The management server can also provide backend computing services, such as vehicle recognition operations, such as vehicle recog...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



