Method and device for accurately and quickly measuring and calculating extra-high voltage power transformation engineering lead
A technology for substation engineering and UHV, which is applied in the field of accurate and rapid measurement and calculation of UHV substation engineering wires, which can solve the problems of unintegrated detection, obstacles blocked by objects, and UHV wires are not easy to carry, etc., to achieve thorough detection results, The effect of detecting smoothness and preventing blocking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0035] Such as Figure 1-7As shown in the figure, the device for accurate and rapid measurement and calculation of UHV substation conductors includes a main detection ring 1 and a display terminal 12. The main detection ring 1 is symmetrically divided into a first detection ring 2 and a second detection ring 3 along the horizontal center line. Both sides of the bottom surface of the first detection ring 2 and the top surface of the second detection ring 3 are provided with a storage tank 8, and the inside of the storage tank 8 is provided with a biaxial hydraulic cylinder 4, and the two sides of the biaxial hydraulic cylinder 4 are fixedly provided with a connecting frame 5, and the connecting frame 5. One end away from the double-axis hydraulic cylinder 4 is fixed to the side of the storage tank 8. The connecting frame 5 supports the inside of the storage tank 8 on the surface of the double-axis hydraulic cylinder 4. The movable ends on both sides of the double-axis hydraulic ...
specific Embodiment 2
[0039] Such as Figure 7 As shown, the accurate and fast method for measuring and calculating the conductors of UHV substation projects, the calculation method for detecting the main ring 1 is as follows:
[0040] Sp1: Determine the environment, determine the position of the uninstalled UHV wire to be detected, and perform clamping of the clamping devices 14 on both sides of the detection main ring 1 according to the detected length and position of the UHV wire;
[0041] Sp2: installation preparation, clamp the clamping device 14 at the position where the two ends of the length of the UHV wire to be tested are located, the end of the UHV wire passes through the detection main ring 1, and the detection main ring 1 is placed at one end of the UHV wire, Remove the display terminal 12 from the bottom of the handle 7, and the preparatory work is completed;
[0042] Sp3: detection, the biaxial motor 1303 of the connection device 13 rotates, one end of the connection steel wire 1304...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com