A recycled concrete, prefabricated technology, used in roads, roads, pavements paved with prefabricated blocks, etc., can solve the problems of affecting durability, concrete fragmentation durability, construction inconvenience, etc., to improve shear and bending resistance. ability, control construction quality, and avoid the effects of construction operations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0236] Rural roads are to be constructed. Rural roads are Class 4 roads, and the width of the road surface shall not be less than 4.5m. The road width of the selected section shall be 5m.
[0237] Before construction, set the formwork according to the required size, remove sundries and accumulated water in the formwork, clean the contact surface between the formwork and concrete, and apply a release agent. Set the steel bars in the formwork, weld the steel bars after binding, and set the steel bar protective layer pads. After the self-compacting recycled concrete is poured, it is cured, and the mold is demoulded after the strength reaches 100 parts, so as to obtain the first plate body, the second plate body, the board, and the supporting plate of the required splicing unit. Before the first plate body, the second plate body, the board, and the supporting plate are used, the rough treatment of the contact surface must be carried out. The rough treatment of the contact surface ...
Embodiment 2
[0249] To construct the fourth-grade highway in the natural division II area, the road surface width of the selected section shall be 5m. The subgrade is clay with low night limit, and the distance between the top of the roadbed and the groundwater level is 1.2m on average. Reinforced concrete pavement is prepared by using recycled concrete material made of crushed waste concrete as coarse aggregate. Because the reinforcement is calculated according to the minimum reinforcement ratio of the structure, and the safe and conservative calculation is based on the calculation of the slab body with reinforcement. According to the traffic investigation, the design axle load P s =100kN, the heaviest axle load P m =150kN, the designed axle load is designed to act 100 times a day at the initial stage of use, and the average annual growth rate of traffic volume is 5 copies.
[0250] Carry out construction by the method in embodiment 1. And check the prepared pavement.
[0251] (1) Tra...
PUM
| Property | Measurement | Unit |
|---|---|---|
| compressive strength | aaaaa | aaaaa |
| flexural strength | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 