Tunnel reinforced concrete two-lining explosion-control dismantling charging structure and construction method
A technology for reinforced concrete and tunnels, which is applied in the field of charge structures and constructions for the controlled blasting demolition of reinforced concrete secondary linings in tunnels. The effect of ground impact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following will be combined with Figure 1-Figure 5 The present invention is described in detail, and the technical solutions in the embodiments of the present invention are clearly and completely described. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0030] The present invention hereby provides a kind of tunnel reinforced concrete second liner controlled explosion demolition charging structure, such as Figure 1-Figure 5 As shown, it can be implemented in the following way: divide the demolition into sections based on the construction joint position of the second lining concrete, arrange the arch waist blasting area 1 symmetrically at the arch waists on both sides of the second lining, an...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


