Power transmission project entity acceptance method based on Cesium platform
An engineering and platform technology, applied in the field of physical acceptance of power transmission projects based on the Cesium platform, can solve problems such as safety risks, doubts about the authenticity of data, and two-dimensional drawings that are not conducive to staff's spatial imagination, so as to improve quality and work intensity. The effect of large and good application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] refer to figure 1 , a method for acceptance of power transmission projects based on the Cesium platform, comprising the following steps: taking the position of each power equipment in the power transmission project to be detected as the basis, importing the GIM grid information model of each power equipment into the Cesium platform, and generating the GIM model of the power transmission project ; Obtain the laser point cloud data of each power equipment in the power transmission project to be detected in units of spans, and use the laser point cloud data of each power equipment in the power transmission project to be detected to generate a laser point cloud model; The difference between the height of the tower and the horizontal distance is used as the basis for judgment, and the distances in the GIM model of the power transmission project are traversed to realize the matching between the laser point cloud model and the GIM model of the power transmission project; the ma...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 