Unlock instant, AI-driven research and patent intelligence for your innovation.

Power transmission project entity acceptance method based on Cesium platform

An engineering and platform technology, applied in the field of physical acceptance of power transmission projects based on the Cesium platform, can solve problems such as safety risks, doubts about the authenticity of data, and two-dimensional drawings that are not conducive to staff's spatial imagination, so as to improve quality and work intensity. The effect of large and good application prospects

Pending Publication Date: 2022-05-17
国网江苏省电力有限公司建设分公司
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the current acceptance work, there are still many defects. For example, the acceptance of key items such as the upper part of the iron tower, the ground wire and the accessory fittings must be completed by means of climbing operations or telescopes. This method not only has safety risks, but also the data is real. In addition, the work form is mainly based on 2D drawings, but the 2D drawings are not conducive to the spatial imagination of the staff. According to the statistics of researchers, 60% of construction errors come from the misunderstanding of the construction drawings by the staff.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power transmission project entity acceptance method based on Cesium platform
  • Power transmission project entity acceptance method based on Cesium platform
  • Power transmission project entity acceptance method based on Cesium platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0051] refer to figure 1 , a method for acceptance of power transmission projects based on the Cesium platform, comprising the following steps: taking the position of each power equipment in the power transmission project to be detected as the basis, importing the GIM grid information model of each power equipment into the Cesium platform, and generating the GIM model of the power transmission project ; Obtain the laser point cloud data of each power equipment in the power transmission project to be detected in units of spans, and use the laser point cloud data of each power equipment in the power transmission project to be detected to generate a laser point cloud model; The difference between the height of the tower and the horizontal distance is used as the basis for judgment, and the distances in the GIM model of the power transmission project are traversed to realize the matching between the laser point cloud model and the GIM model of the power transmission project; the ma...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a power transmission project entity acceptance method based on a Cesium platform, and belongs to the field of power transmission and transformation project construction. According to the method, improvement of a power transmission project entity acceptance means is taken as a target, and a power transmission project GIM power grid information model is imported into a Cesium geographic information platform to serve as design standard data; a three-dimensional laser scanner is adopted to scan in a power transmission project construction site to obtain laser point cloud data, and a power transmission project laser point cloud model is established after processing is performed by taking a span as a unit; traversing the whole line of the GIM model of the power transmission project, and finding the GIM model matched with each laser point cloud model; and manually selecting points in the point cloud data to measure various to-be-accepted parameters, and comparing the to-be-accepted parameters with a standard value to obtain a construction error. The system has the advantages of high automation degree, no need of field measurement of workers and multiple types of acceptance items, reduces the workload of the acceptance workers to a certain extent, and effectively improves the quality and efficiency of the acceptance work of the power transmission project.

Description

technical field [0001] The invention belongs to the field of power transmission and transformation engineering construction, and in particular relates to a method for actual acceptance of power transmission projects based on a Cesium platform. Background technique [0002] As the scale of transmission line construction in my country increases year by year, it is bound to face a large number of completion inspection and acceptance work of transmission projects. However, in the current acceptance work, there are still many defects. For example, the acceptance of key items such as the upper part of the iron tower, the ground wire and the accessory fittings must be completed by means of climbing operations or telescopes. This method not only has safety risks, but also the data is real. In addition, the main form of work is 2D drawings, but 2D drawings are not conducive to the spatial imagination of the staff. According to the statistics of researchers, 60% of construction errors...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G01S17/88G01C15/00G06F17/10
CPCG01S17/88G01C15/002G06F17/10Y04S10/50
Inventor 杜长青谢洪平韩超余鹏唐自强谷开新杨永前赵会龙范舟孔硕颖刘骁繁郭易木田爱忠
Owner 国网江苏省电力有限公司建设分公司