Unlock instant, AI-driven research and patent intelligence for your innovation.

Brickwork wall wire box holing-free prefabricated installation method based on BIM (Building Information Modeling) technology

An installation method and technology of masonry walls, which are applied in the on-site preparation of building components, processing of building materials, formwork/template/work frame, etc., can solve the problem of increased engineering cost, waste of manpower and material resources, and poor positioning of on-site junction boxes. Accuracy and other issues, to achieve the effect of reducing the loss rate of masonry, improving work efficiency and reducing processes

Pending Publication Date: 2022-06-03
THE FOURTH CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Based on the above procedures, it has been found in a large number of engineering practices that the positioning of the on-site wire box is not accurate, the quality of slotting and opening cannot be guaranteed, the installation quality of the wire box with a horizontal and vertical error exceeding 3mm cannot be guaranteed, the loss of masonry cannot be controlled, and a lot of civilized construction waste Manpower and material resources lead to an objective increase in engineering costs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Brickwork wall wire box holing-free prefabricated installation method based on BIM (Building Information Modeling) technology
  • Brickwork wall wire box holing-free prefabricated installation method based on BIM (Building Information Modeling) technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0009] The present invention will be further described below in conjunction with the embodiments, the purpose is only to better understand the content of the present invention, therefore, the examples do not limit the protection scope of the present invention.

[0010] A prefabricated installation method for a masonry wall junction box without openings based on BIM technology, the operation steps are as follows:

Step 1: Before construction, use BIM technology to pre-simulate the arrangement of the secondary structure and masonry construction, and locate the wire box 1;

Step 2: Use the BIM brick arranging function to arrange the masonry bricks, confirm the size of each masonry and the size of the hole in the prefabricated box 1, and generate the brick arrangement diagram;

The third step: modular prefabrication of the same system junction box 1 in the production base;

Step 4: According to the drawings, confirm the installation quantity and position of the junction box 1 and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of building construction, in particular to a masonry wall wire box holing-free prefabricated installation method based on a BIM technology. According to the method, firstly, the modularized wire box is prefabricated, then the formwork is manufactured according to the size of the hole formed in the wall after external expansion, after the wire box and the wire pipe are installed and shaped in the formwork, the shaped whole is taken out and placed in the hole reserved in the wall in advance, and the whole can be modularly produced in a manufacturer according to a BIM model; the whole wire box is directly put into a hole in a construction site, a large amount of time is saved, the accuracy of the wire box is improved, workers construct according to a brick arrangement drawing, the working procedures are reduced, the efficiency is improved, the brickwork loss rate can be reduced by more than 80%, and the one-time mounting yield of the wire box is 100%. And the working efficiency is improved by more than 80%.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a hole-free prefabricated installation method of a masonry wall junction box based on the BIM technology. Background technique [0002] In the construction of mechanical and electrical engineering, the installation of the wire box and the wire pipe of the secondary wall is carried out after the masonry of the brick wall is completed. Line pipe installation → threading and cover plate installation → site clearance after construction. Based on the above procedures, it has been found in a large number of engineering practices that the on-site wire box positioning is inaccurate, the quality of slotting and opening cannot be guaranteed, the horizontal and vertical error of the wire box exceeds 3mm, the installation quality cannot be guaranteed, the masonry loss cannot be controlled, and civilized construction wastes a lot of money Manpower and material resources, result...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13E04G15/06E04G21/00E04G21/02E04G21/22
CPCG06F30/13E04G15/063E04G21/00E04G21/02E04G21/22
Inventor 李泽明王依琳
Owner THE FOURTH CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU