Construction method for semi-circular pile of covered and excavated station
A construction method, semi-circular technology, applied to artificial islands, sheet pile walls, water conservancy projects, etc., can solve problems such as difficulty in ensuring project quality and troublesome construction of semi-circular piles, and achieve easy demolition, reduced labor input, and reduced cost input Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] In this embodiment, the construction method of the semi-circular piles at the cover and excavation station adopts the following steps: setting out the pile positions on the enclosure piles, carrying out drilling construction on the ground 5 according to the pile positions to form the pile holes; preparing the steel cage 1, in the In the reinforcing bar cage 1, part of the reinforcing bars protrude radially to form a semicircular bar cage 2 with a circular arc profile; a bamboo plywood 3 is set, and the bamboo plywood 3 is connected to the semicircular bar cage 2; It is inserted in the pile hole; the concrete 7 is poured into the pile hole and solidified; the crown beam is set with a retaining wall, and earthwork is excavated; the bamboo plywood 3 is removed to obtain a semi-circular pile.
[0050] The semicircular rib cage 2 is welded with positioning ribs 4 , and the positioning ribs 4 are arranged in two and disposed on opposite sides respectively so as to extend to th...
Embodiment 2
[0054] In this embodiment, the construction method for the semi-circular piles of the cover and excavation station includes the following steps: stake out the enclosure piles, and drill holes on the ground 5 according to the pile positions to form pile holes; In the reinforcing bar cage 1, part of the reinforcing bars protrude radially to form a semicircular bar cage 2 with a circular arc profile; a bamboo plywood 3 is set, and the bamboo plywood 3 is connected to the semicircular bar cage 2; It is inserted in the pile hole; the concrete 7 is poured into the pile hole and solidified; the crown beam is set with a retaining wall, and earthwork is excavated; the bamboo plywood 3 is removed to obtain a semi-circular pile.
[0055] The semicircular rib cage 2 is welded with positioning ribs 4 . The positioning ribs 4 are arranged in two and are respectively arranged on opposite sides so as to extend to the ground 5 and coincide with the pile holes on the ground 5 . The bamboo plywo...
Embodiment 3
[0060] In this embodiment, the construction method for the semi-circular piles of the cover and excavation station includes the following steps: stake out the enclosure piles, carry out drilling construction on the ground 5 according to the pile positions, and form pile holes; prepare steel cages 1, In the reinforcing bar cage 1, part of the reinforcing bars protrude radially to form a semicircular bar cage 2 with a circular arc profile; a bamboo plywood 3 is set, and the bamboo plywood 3 is connected to the semicircular bar cage 2; the reinforcing bar cage 1 is lowered, It is inserted in the pile hole; the concrete 7 is poured into the pile hole and solidified; the crown beam is set with a retaining wall, and earthwork is excavated; the bamboo plywood 3 is removed to obtain a semi-circular pile.
[0061] The semi-circular rib cage 2 is welded with positioning ribs 4 . The positioning ribs 4 are arranged in two and are respectively arranged on opposite sides so as to be able to...
PUM