Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A method for setting up a shaft above the underground excavation section of a subway to construct a large cross section

A large-section, vertical shaft technology, applied in vertical shaft equipment, sinking, mining equipment, etc., can solve the problems of relatively large influence of structures around the interval, complex force transfer of structures, and difficult control of land subsidence, so as to reduce construction risks, The effect of simplifying the construction steps and reducing the impact

Active Publication Date: 2022-08-05
CHINA RAILWAY DESIGN GRP CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The shallow buried excavation section of the interval crossing line is relatively large, and the subdivision excavation will disturb the soil many times, making it difficult to control the land subsidence, construction organization is difficult, and construction risk is high
In the design of the crossing line in the traditional underground excavation section, one is to select a suitable location on the side of the ground section for the construction of the vertical shaft, excavate the cross passage perpendicular to the section tunnel, wrap the largest section of the crossing line in the cross passage, and then use the construction passage as an auxiliary tunnel Excavating the main body of the interval, this construction method needs to occupy the construction shaft structure on one side of the interval, which has a greater impact on the surrounding structures of the interval; Frequent changes from small to large and from large to small, the structural force conversion is very complicated, which brings great difficulty to the construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for setting up a shaft above the underground excavation section of a subway to construct a large cross section
  • A method for setting up a shaft above the underground excavation section of a subway to construct a large cross section
  • A method for setting up a shaft above the underground excavation section of a subway to construct a large cross section

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0074] Below, the present invention will be described in detail with reference to the accompanying drawings and embodiments:

[0075] like Figure 1 to Figure 8 As shown in the figure, a method for setting up a shaft above an underground excavation section of a subway to construct a large cross-section of a crossing line includes the following steps:

[0076] A. Excavate the shaft and apply the initial support 101 of the shaft;

[0077] B. Apply the initial support 102 of the transverse passage and the temporary inverted arch:

[0078] At the horizontal passage, the Matoumen strengthens the grille steel frame, breaks the shaft wall, excavates the horizontal passage in layers by the step method, and simultaneously constructs the initial support 102 of the horizontal passage and the temporary inverted arch according to the steps;

[0079] C. Standard section 103 in the excavation shaft

[0080] At the standard section of the inner section of the shaft, the steel grille is str...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for arranging a shaft above an underground excavation section of a subway to construct a large cross-section, comprising the following steps: excavating a shaft and applying initial support for the shaft; applying initial support for a transverse passage and a temporary inverted arch: excavation The standard section of the section in the shaft; the lining structure of the shaft and the cross channel is constructed; the standard section of the section in the excavation of the cross channel; the section of the cross section of the excavation of the cross channel; the section of the cross section of the excavation of the shaft and the cross channel; after the construction of the section tunnel structure is completed , Break the shaft out of the ground structure, backfill the covering soil, and restore the road surface. The invention solves the problems of high construction risk, complicated procedures and great influence on the city of traditional crossing lines. The invention adopts the structure type of the vertical shaft and the interval tunnel, which can reduce the length of the transverse passage, speed up the construction progress of the transverse passage, and reduce the project investment, so as to meet the excavation requirements of the crossing line, and at the same time, it can reduce the impact on the urban surface. In addition, the force conversion of the structure is stable, the construction steps are simplified, and the construction risk is reduced.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a method for arranging a shaft above an underground excavation section of a subway to construct a large cross section. Background technique [0002] With the rapid development of rail transit in my country, the scale of urban subway network construction has continued to expand, and the construction design of shallow buried, large-span, variable-section tunnels such as turn-back lines and crossing lines in subway sections is increasing. [0003] The section of the shallow buried undercut of the interval crossing line is relatively large, and the subsection excavation will disturb the soil for many times, making the land subsidence difficult to control, the construction organization is difficult, and the construction risk is high. In the traditional crossover design of the undercut section, one is to select a suitable position to construct the shaft on one s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D5/11E21D1/00
CPCE21D5/11E21D1/00
Inventor 张鹏姜伟丹张继清索晓明李爱东张春雷杨守峰杨富翔李欣李博刘颖
Owner CHINA RAILWAY DESIGN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products