Unlock instant, AI-driven research and patent intelligence for your innovation.

Bridge pile foundation construction extrusion supporting disc hole forming method

A technology of pile foundation and hole forming, which is applied in basic structure engineering, sheet pile wall, construction, etc., can solve the problems of large hole forming loss, waste of resources, long hole forming time, etc. The effect of short pile length

Pending Publication Date: 2022-08-09
GUANGDONG PROVINCIAL CHANGDA HIGHWAY ENG
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to overcome the deficiencies of the prior art, one of the purposes of the present invention is to provide a method for forming holes in bridge pile foundation construction, which can solve the problems of large hole-forming loss of equipment, long hole-forming time, and serious waste of resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge pile foundation construction extrusion supporting disc hole forming method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be further described below with reference to the accompanying drawings and specific embodiments. It should be noted that, on the premise of no conflict, the embodiments or technical features described below can be combined arbitrarily to form new embodiments. .

[0026] It should be noted that when a component is referred to as being "fixed to" another component, it can be directly on the other component or there may also be a centered component. When a component is considered to be "connected" to another component, it can be directly connected to the other component or there may be an intervening component at the same time. When a component is considered to be "set on" another component, it may be directly set on the other component or there may be a co-existing centered component. The terms "vertical," "horizontal," "left," "right," and similar expressions are used herein for illustrative purposes only.

[0027] Unless otherwise defined, a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bridge pile foundation construction extruding and supporting disc hole forming method. A percussion drill, a rotary excavating drill and a rotary drill are matched to machine a main hole to form a hole; after the main hole is formed, a hole detector is adopted to detect whether the hole depth, the hole diameter and the perpendicularity deviate or not, the corresponding model of a branch disc machine is selected according to the pile diameter of a pile foundation, extrusion and expansion operation is conducted, in the construction process, extrusion and expansion pressure is detected to generate actual detection data, and all branch disc extrusion and expansion operation is conducted in sequence; and after extrusion and expansion are completed, hole cleaning treatment is conducted, a reinforcement cage is put down, and concrete pouring is conducted. A percussion drill, a rotary drilling drill and a rotary drilling drill are matched to process a main hole and form a hole, a detection step is matched with an extrusion and expansion operation step, and continuous operation is carried out by sequential extrusion and expansion, hole cleaning and subsequent steps, so that the problems that a geological rock stratum is hard and a common hole forming process is difficult to construct are solved, the hole forming speed of a pile foundation is increased, and the pile length required by the pile foundation is shortened; the construction period is guaranteed, and economic benefits are remarkable.

Description

technical field [0001] The invention relates to the field of bridge pile foundation construction, in particular to a method for forming a hole for a squeezed support plate in bridge pile foundation construction. Background technique [0002] At present, in the construction of bridge pile foundations, some areas have complex geology, many interlayers, and hard rock layers, some of which are as high as 180 MPa. The general bridge pile foundations in the prior art mostly use conventional drilling methods such as impact drilling, rotary drilling or rotary drilling. In the case of "complex geology, many interlayers, and hard rock formations", conventional pore-forming processes are difficult to meet the schedule requirements in such geology, the equipment pore-forming loss is large, the pore-forming time is long, and the resource waste is serious. SUMMARY OF THE INVENTION [0003] In order to overcome the deficiencies of the prior art, one of the objectives of the present inven...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D5/34E02D27/12
CPCE02D5/34E02D27/12
Inventor 李国俊严平李志生冯浩远劳政焕孙振华邵皓然陈泽京李志国文佳伟梁喜成胡明江
Owner GUANGDONG PROVINCIAL CHANGDA HIGHWAY ENG