Power distribution equipment monitoring control system

A power distribution equipment, monitoring and control technology, applied in the direction of electrical testing/monitoring, aerospace equipment, information technology support systems, etc., can solve the problems of time-consuming switching to online, unfavorable quality management, and increased storage capacity of auxiliary memory devices, etc. , to achieve the effects of eliminating mutual inconsistencies, reducing storage capacity, and making settings and management easy

Inactive Publication Date: 2006-11-22
KK TOSHIBA
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The individual management of each operation program 52a, 53a, and 54a leads to an increase in the storage capacity of the auxiliary memory devices 51, 56; and when the on-line operation program 52a is modified, the monitoring control program 53aa of the simulation operation program 53a must also be modified, so maintenance costs are incurred. ; and (can) produce the problem of inconsistency between the two programs 52a and 53a of transformation, which is also unfavorable for quality management
[0008] (2) Also, the biggest problem is that it takes time to switch between online operation and simulation operation
[0009] However, since the simulation operation program 53a is composed of the monitoring control program 53aa, the TC simulation program 53ab, and the system simulation operation program 53ac, these programs must be saved in sequence, and the on-line operation including operation can only be switched after the saving. The switchover to online takes time and becomes an accident-inducing problem during the period, a problem in the performance of the system
[0010] Therefore, in the above-mentioned program generation method, there are two programs of the same simulation operation program 53a as the on-line operation program 52a, and at least two such operation programs 52a and 53a must be managed separately.
And it cannot switch smoothly between simulation operation and online operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution equipment monitoring control system
  • Power distribution equipment monitoring control system
  • Power distribution equipment monitoring control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] Embodiments of the present invention will be described below with reference to the drawings.

[0039] 1st embodiment

[0040] Fig. 1 is a configuration diagram showing a first embodiment of a monitoring and control system for power distribution equipment according to the present invention.

[0041] The monitoring and control system of the power distribution equipment is a system that uses distribution lines to monitor and control the power distribution equipment 1 including multiple power distribution instruments. For example, a remote monitoring and controlling device (hereinafter referred to as TC) 4 such as a telemeter is connected to the central monitoring and controlling device 2 .

[0042] The central monitoring and control device 2 is composed of an auxiliary storage device (HDD) 22 storing an operating program 21 as a source program for monitoring and controlling the power distribution equipment 1, a main storage device 23, and a monitoring and control processi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

PROBLEM TO BE SOLVED: To reduce memory capacity and maintenance cost for programs. SOLUTION: A central monitor and control device 2 which monitors and controls electric power distribution equipment 1 through a remote monitor and control device (TC) 4 includes a means for generating an online operation program and a simulation program, which simulates electric power distribution equipment and operates in the same manner as an online operation from a source program 21 which monitors and controls the electric power distribution equipment; an actual monitor and control means 241 which monitors and controls the electric power distribution equipment through the TC based on the online operation program during the online operation; and a simulation means 243 which performs electric power distribution equipment reaction operation and the simulation of its failure by transmission and reception of information by a TC simulation program means 242 and its operation means, which simulate the same operation as the TC based on the simulation operation program during simulation, thereby performing simulation other than the online operation of the electric power distribution equipment.

Description

technical field [0001] The present invention relates to a monitoring and control system of a power distribution device equipped with a simulation operation function of a power distribution device including a plurality of power distribution devices. Background technique [0002] In the past, the simulation operation program of the monitoring and control system of power distribution equipment was as follows: Figure 12 Generated in order as shown. [0003] First, a source program written in a high-level language is prepared on the secondary storage device (HDD) 51 . This source program consists of an on-line (On-Line) operation program 52a, a simulation operation program 53a, and one or more other operation programs 54a. Such as Figure 13 As shown, the simulation operation program 53a includes a monitoring control program 53aa for monitoring and controlling power distribution equipment including a plurality of power distribution instruments, a remote monitoring and control ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02B15/00G09B9/00G05B23/02G06F19/00G06Q10/04G06Q50/00G06Q50/06H02J3/00
CPCY04S10/50
Inventor 中村国男市村义宏
Owner KK TOSHIBA