High board road for city
A road and city technology, applied in roads, roads, buildings, etc., can solve problems such as increasing the workload of sanitation departments, traffic accidents and personal safety, and affecting environmental sanitation, etc., to protect water resources from loss, reduce dust, and prevent The effect of traffic accidents
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] figure 1 Shown is a schematic diagram of the urban high-slab road structure. This kind of urban high-slab road is mainly composed of the main board road 4, the bicycle board road 7 and the green isolation lawn 3 between the two, and the sidewalk 8 is close to the bicycle board road 7 . Greening isolation lawn 3 is set between main board road 4 and bicycle board road 7, and the road surface of both is all higher than isolation lawn 3 grounds, and main board road 4 both sides and green space ground are built into vertical or slope surface. And on the main board roadside or the side of the bicycle boardway, the water outlet 1 is set, and its mouth surface is higher than the lawn 3 ground and lower than the road surface. Rainwater is collected in the lawn in rainy days, so that it can slowly infiltrate into the ground, protect water resources, and prevent Silt deposits on the road. Concrete piers or steel guardrails 6 are installed at intervals on both sides of the main b...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com