Large slag ladle spraying process
A process and technology of slag tank, which is applied in the field of spraying process of large slag tank, can solve the problems of increasing mechanical workload, waste of manpower and material resources, and reducing work efficiency, so as to reduce construction machinery workload, save energy, and reduce sticking tanks The effect of the frequency of the phenomenon
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
specific Embodiment approach
[0017] A spraying process of a large slag tank, this process includes the following process steps: adding water and slaked lime into the container, stirring with compressed air; spraying the uniformly stirred spray paint on the inner wall of the large slag tank and the inner tank with a spray gun on the bottom.
[0018] In the spraying process of the above-mentioned large slag tank, the weight ratio of water and slaked lime added to the container is 7-10:1; the pressure of the compressed air used when stirring with compressed air is 0.4-1 MPa, and the stirring time is 3-10 Minutes; when spraying with a spray gun, the temperature of the large slag tank is 400-500 °C.
Embodiment 1
[0019] Embodiment 1: the container adds water and slaked lime that weight ratio is 7: 1, the pressure of the compressed air used when stirring with compressed air is 0.5 MPa, and the stirring time is 5 minutes; The temperature is 400°C, and the implementation effect: there is basically no dust pollution, no sticking phenomenon occurs, the oil consumption per ton of slag is 0.21 liters, and the frequency of construction machinery failure is 0.5 times / day.
Embodiment 2
[0020] Embodiment 2: the container adds water and slaked lime with a weight ratio of 9:1, the pressure of the compressed air used when stirring with compressed air is 0.6 MPa, and the stirring time is 5 minutes; the temperature of the large slag tank when spraying with a spray gun The temperature is 450°C, and the implementation effect: there is basically no dust pollution, no sticking phenomenon occurs, the oil consumption per ton of slag is 0.21 liters, and the frequency of construction machinery failure is 0.5 times / day.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com