Method for continuous processing T beam bridge floor
A treatment method and beam-hanging technology, which is applied in bridges, bridge maintenance, bridge reinforcement, etc., can solve the problems that the effect of the treatment method of rush repair filling joints is not obvious, etc., and achieve the effect of remarkable repair effect, not easy to be damaged again, and fast speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0014] The continuous processing method of T-beam bridge deck comprises the following steps:
[0015] a. Clean up the micro seams on the damaged bridge deck, remove the surface material, and expose the fresh concrete surface;
[0016] b. Re-set the connecting steel bar according to the original steel bar label in a conventional method;
[0017] c. Set the lining plate under the T-beam wing plate, and set the channel steel hanging beam on the top of the T beam. The channel steel hanging beam and the lining plate are fixed by connecting bolts. The channel steel hanging beam is embedded in the T beam and can be stretched forward and backward. , the connecting bolts are set in the channel steel channel;
[0018] d. Brush hot asphalt on the concrete surface, pour asphalt mortar and tamp it while it is hot, so that the treated part is flush with the original bridge deck.
Embodiment 2
[0020] The continuous processing method of T-beam bridge deck comprises the following steps:
[0021] a. Clean up the micro seams on the damaged bridge deck, remove the surface material, and expose the fresh concrete surface;
[0022] b. Re-set the connecting steel bar according to the original steel bar label in a conventional method;
[0023] c. Set the lining plate under the T-beam wing plate, and set the channel steel hanging beam on the top of the T beam. The channel steel hanging beam and the lining plate are fixed by connecting bolts. The channel steel hanging beam is embedded in the T beam and can be stretched forward and backward. , the connecting bolts are set in the channel steel channel;
[0024] d. Adhesive joint tape on the concrete surface, pour asphalt mastic and compact it, so that the treated part is flush with the original bridge deck.