Filling pile construction pore-creating method of pervious ultra-deep loose backfill two-piece stone zone

A technology of two-piece stone and cast-in-place piles, which is applied to sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as unfavorable construction, reduced pressure on hole walls, buried drills, and collapse of drilling rigs, so as to shorten the time for cleaning holes , reduce construction time, increase the effect of construction effect

Active Publication Date: 2009-01-28
CHINA NAT OFFSHORE OIL CORP +1
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method is prone to the following problems: 1. While the mud is sucked from the bottom of the hole, due to the untimely replenishment of the mud at the hole, the liquid level of the mud in the hole changes greatly, causing the pressure on the wall of the hole wall to decrease rapidly, resulting in soil Due to the change of body stress, the stratum with unstable hole wall (such as quicksand, uncompacted sand, soil layer, etc.) is prone to collapse holes, and even cause accidents of buried drills and drilling rigs.
2. Due to the large difference in performance (such as viscosity, specific gravity, etc.) between the pumped mud and the supplemented mud, for the stratum with unstable hole walls, this change will also bring unfavorable results to the construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Filling pile construction pore-creating method of pervious ultra-deep loose backfill two-piece stone zone

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] Such as figure 1 As shown, the present invention carries out the construction of cast-in-place piles to form holes in backfilling two stone layers 1, and below the backfilling two stone layers 1 are successively seabed silt layer 2, silty clay layer 3, clay layer 4, residual soil layer 5 and strongly weathered rock layer 6 . The construction of cast-in-situ piles of the present invention specifically comprises the following steps:

[0030] Step 1, place the casing 9 at a certain depth (not less than 1.5 meters) of backfilling the two stone layers 1, the seabed silt layer 2, and the silty clay layer 3, and place the casing 9 by vibrating and sinking. Utilize drilling rig 7 and percussion drill 8 to carry out punching construction at backfilling two stone layers 1 . In front of the placed casing 9 (that is, at the position opposite to the installation position of the drilling rig 7), a flood flood area 10 in the range of 4 to 6 m is reserved in advance as a channel for ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a drilling method for the construction of a cast-in-place pile of a dank ultra-deep loose refilling rubble area, which comprises the following steps: step 1: a slope area of 4m to 6m is arranged in an area right ahead an arranged pile casing to serve as a slurry return flow line, and a slurry pool is dug outside the slope area; step 2: residue is drawn out once every 1 hour to 3 hours during a punching process; step 3: all the drawn-out slurry flows backwards into a drilling hole by utilizing the slope area; step 4: when punching work is carried out, the proportion of the slurry in the hole is increased, thereby being capable of increasing wall retaining capability and reducing hole collapse risk; and step 5: after drilling is carried out to a stable stratum of certain depth, the proportion of the slurry in the hole is gradually reduced; slurry containing the residue is discharged; and the slurry is discharged once every 2 hours to 3 hours. By adopting the method that the slurry flows backwards naturally, the method of the invention changes the traditional mode of slurry circulation, maintains the balance of the slurry, simplifies the construction process and lowers the construction risk.

Description

technical field [0001] The invention relates to a hole-forming method for permeable super-deep loosely backfilling a two-piece stone area with cast-in-place piles. Background technique [0002] There are roughly several types of hole-forming technologies for conventional cast-in-place piles: [0003] 1. Non-squeeze method of hole forming: such as dry operation drilling (digging) drilling, mud retaining drilling (digging) drilling, full casing follow-up retaining drilling (digging) drilling; among them, [0004] Drilling (digging) into holes by dry operation method and drilling (digging) into holes with mud retaining wall are suitable for construction in sites with good engineering geological conditions, and it is basically not easy to produce collapsed holes; [0005] The construction cost of drilling (digging) into the hole by the method of following up the retaining wall with the full casing pipe is high, generally 1 / 3 higher than other methods. [0006] 2. Partial extru...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/34E02D7/00
Inventor 金传宏杨爱国周飞
Owner CHINA NAT OFFSHORE OIL CORP