Integrated detection system and method of management and control
A detection instrument, a one-time technology, applied in the direction of testing metals, material inspection products, instruments, etc., can solve problems such as poor management, backward monitoring methods, and inadequate monitoring
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Refer to attached Figure 4 , taking cement concrete strength testing as an example, an integrated system and method for testing, management and control, at least including signing a contract, formulating a testing plan, sample extraction, test piece preparation, test piece health care, test piece transportation, test piece warehousing and handover, test There are 19 steps including storage of test pieces, transfer of test pieces out of the warehouse, test preparation, test piece testing, sample processing, report filling, result evaluation, report review, report approval, report printing, report issuance, and report archiving.
[0018]The specific steps are as follows: 1) Sign the contract: log in to the business management computer as the contract administrator, call the contract management interface, enter the contract information in the interface, the system will automatically generate the contract number and test number, and select the testing process suitable for t...
Embodiment 2
[0020] Refer to attached Figure 5 , taking cement strength testing as an example, an integrated system and method for testing, management and control, at least including signing a contract, formulating a testing plan, sample collection, sample disposal, sample transportation, sample storage handover, sample storage, sample delivery handover, test There are 20 steps including sample preparation, test piece maintenance, test preparation, test piece testing, sample processing, report filling, result evaluation, report review, report approval, report printing, report issuance, and report archiving.
[0021]The specific steps are as follows: 1) Sign the contract: log in to the business management computer as the contract administrator, call the contract management interface, enter the contract information in the interface, the system will automatically generate the contract number and test number, and select the testing process suitable for the sample , it should be noted that aft...
Embodiment 3
[0023] refer to Image 6 , taking steel bar strength testing as an example, an integrated system and method for testing, management and control, at least including signing a contract, formulating a testing plan, sample collection, sample disposal, sample transportation, sample storage handover, sample storage, sample delivery handover, test There are 19 steps including piece preparation, test preparation, test piece testing, sample processing, report filling, result evaluation, report review, report approval, report printing, report issuance, and report archiving.
[0024]The specific steps are as follows: 1) Sign the contract: log in to the business management computer as the contract administrator, call the contract management interface, enter the contract information in the interface, the system will automatically generate the contract number and test number, and select the testing process suitable for the sample , it should be noted that after the detection process is sele...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com