Space-time conversion exploitation method for high and steep rock slope stock ground near river
A rocky slope, time-space conversion technology, applied in the direction of excavation, ground mining, earthwork drilling and mining, etc., can solve the problem that cannot be used, the terrain of the high and steep rocky slope material yard is steep, and the excavation slag transportation road cannot be formed, etc. problems, to achieve the effect of guaranteeing supply and safe and effective mining
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Example 1: Space-time conversion mining of high and steep rock slope stockyard in Jinping Dabenliugou
[0019] 1. General situation of stock yard
[0020] (1) Geographic location
[0021] The Dabenliugou quarry is located on the inner side of the Dabenliugou Highway on the left bank of the dam site of the Jinping I Hydropower Station, about 9km away from the dam site, with an elevation of 1660-2100m, and a height difference of 450m from the top of the mountain to the foot of the mountain. The exposed strata are 1-3 layers of medium-thick to thick-bedded metamorphic quartz fine sandstone and silty fine sandy slate in the third member of the Triassic Zagunao Formation (T2-3z3 (1-3)). The material source is medium-thick blue-gray metamorphic quartz fine sandstone.
[0022] (2) Topography
[0023] The topography of the material yard is a slope along the direction of the river, with a slope of 50~65° near the river. The stock yard is about 1000m long and 200~250m wide, d...
Embodiment 2
[0029] The other processes are the same as in Example 1, but for a stockyard where the high and steep rocky slope terrain does not have the natural downslope conditions, after the slag cutting groove 1 is formed, the undulating part of the rocky side slope near the top is first cut into a downslope For the slope 8 of the slag cutting trough, follow-up construction will be carried out after the excavated material at the top of the rocky slope has the material storage space for the slag cutting trough 1 that slides down the slope to the contour line in the middle of the mountain.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com