BAS control system of urban railway system and method thereof

A technology of urban rail transit and control system, applied in the field of urban rail transit BAS control system, can solve problems such as unreadable data information, unreadable PLC data information, increase ISCS scheduling complexity, etc., to reduce construction costs, reduce effect of difficulty

Active Publication Date: 2010-05-05
SHANGHAI BAOSIGHT SOFTWARE CO LTD
View PDF1 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0011] Regardless of which station ISCS switch is turned off, the two BAS ring networks will not be able to communicate with each other
If the switch connected to the ring network where the active PLC is located is turned off, the ISCS cannot read the data information of the PLC at this end
[0012] If a double-node failure occurs on the ring network, the switch on the ring network cannot communicate with the ISCS switch, and the ISCS cannot read the PLC data information on the ring netw

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BAS control system of urban railway system and method thereof
  • BAS control system of urban railway system and method thereof
  • BAS control system of urban railway system and method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] pass below Figures 2 to 3 , to introduce a specific embodiment of the present invention.

[0036] An urban rail transit BAS control system of the present invention includes a station-level integrated monitoring system network and a BAS field-level network, the station-level integrated monitoring system network is provided with a redundant scheduling module, and the BAS field-level network is a double-ring network structure , comprising at least two redundant PLCs and a redundant dispatching module, the redundant PLCs are divided into active PLCs and standby PLCs, the active PLCs are connected to a switch set on the ring network, and the standby PLCs are connected to a The exchange that is arranged on another said ring network, each of two BAS ring networks has a network cable connected to the station-level integrated monitoring system network respectively;

[0037] The redundant scheduling module detects the communication status between the station-level integrated mo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a BAS control system of urban railway system and a method thereof. The BAS control system comprises a station level integrated monitoring system network and a BAS field level network, wherein the station level integrated monitoring system network is provided with a redundancy scheduling module, the BAS field level network is in a double loop network structure and comprises at least two redundancy PLCs and a redundancy scheduling module, the redundancy PLCs are divided into a main PLC and a spare PLC and are connected to the station level integrated monitoring system network through the loop network, and the redundancy scheduling module is used for detecting communication states so as to be switched to the spare PLC; the method comprises the following steps: detecting whether the communication between the station level integrated monitoring system network and the main PLC is interrupted through the redundancy scheduling module, and if so, then switching the spare PLC into the main PLC by the redundancy scheduling module. The invention is favorable for lowering the construction cost of the BAS system and reducing the difficulty in integrating a BAS subsystem by an ISCS, and can ensure the uninterrupted and undisturbed automatic switching operation of controlled equipment and modes when a fault appears in any single node.

Description

technical field [0001] The invention relates to a communication control system, in particular to an urban rail transit BAS control system. Background technique [0002] In order to further improve the operation and management level, it has become a trend of subway development to set up an integrated monitoring system (hereinafter referred to as ISCS), and the environment and equipment monitoring system (hereinafter referred to as BAS) is the most important part of ISCS. According to the characteristics of the subway, PLCs are installed at both ends of A and B to collect the electromechanical equipment information at both ends of A and B respectively. The PLCs at both ends of A and B are interconnected and connected to the ISCS network through the network or bus. It is necessary to fully consider the stable and reliable operation of the system. [0003] According to the different construction methods of the BAS system, the redundancy methods used are also different. The two-...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): B61L27/00H04L12/28
Inventor 吴娟汪侃朱晓南
Owner SHANGHAI BAOSIGHT SOFTWARE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products