Extra-deep hole drilling and fast slag tapping construction method
A construction method and ultra-deep technology, applied in earthwork drilling, infrastructure engineering, wellbore/well components, etc., can solve problems such as poor scum removal effect, reduced hole forming speed, and high mud specificity, and achieve The construction is simple, the equipment is simple and easy to manufacture, and the effect of meeting environmental protection requirements
Inactive Publication Date: 2010-10-06
CHINA RAILWAY 18TH BUREAU GRP CO LTD
View PDF5 Cites 9 Cited by
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Due to the ultra-deep water, the length of the bored pile in the water (the free length of the pile foundation) is too long, so the rock-socketed pile foundation is very deep. The domestic drilling method is still the method of forming holes with a gravity impact hammer. The dregs of the holes are all adopted the positive circulation scum method, and the rock particles are floated from the bottom of the hole to the mouth of the hole through the mud with a large specific gravity, and the slag is removed by filtering and settling. The flow rate is very slow, and the effect of scum removal is very poor, which directly leads to a decrease in the hole forming speed (even if the mud pump is increased, the effect is not obvious)
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View moreImage
Smart Image Click on the blue labels to locate them in the text.
Smart ImageViewing Examples
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More PUM
Login to View More Abstract
The invention relates to an extra-deep hole drilling and fast slag tapping construction method, which is carried out according to the following steps: (1) connecting a plurality of steel pipes through flanges; (2) welding a conical opening for collecting settled slag at the bottom sections of the connected steel pipes, and connecting a high-pressure rubber host on the bottom sections of the steel pipes; (3) welding a slurry recovery box on a hole drilling platform; (4) extending the tail end of the steel pipe onto a sieve arranged above the slurry recovery box, and connecting the high-pressure rubber host to an air compressor; and (5) installing, connecting and down placing the steel pipes and the high-pressure rubber hose according to the depth of holes, hanging the steel pipes by a hoisting machine arranged on a percussion drill, opening an air valve of the air compressor so that high-pressure air fast rises along the steel pipes after reaching the steel pipes at the bottom of the hole along the high-pressure rubber hose, forming pressure difference in the steel pipes, floating the settled slag at the bottom to an hole opening, and then, using the slurry recovery box for recovering the slurry for reutilization. The invention accelerates the hole forming speed, shortens the construction work period, recovers the slurry, saves the cost, and protects the construction environment.
Description
Technical field: The invention relates to a construction method for long and deep hole pile foundations, in particular to a construction method for quick slag discharge from ultra-deep boreholes. Background technique: With the continuous improvement of the design and construction level of deep-water bridges, there are more and more pile foundation designs and constructions for deep-water bridges in rock formations. Due to the ultra-deep water, the length of the bored pile in the water (the free length of the pile foundation) is too long, so the rock-socketed pile foundation is very deep. The domestic drilling method is still the method of forming holes with a gravity impact hammer. The dregs of the holes are all adopted the positive circulation scum method, and the rock particles are floated from the bottom of the hole to the hole opening through the mud with a large specific gravity, and the slag is removed by filtering and settling. However, because the hole is too deep an...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More Application Information
Patent Timeline
Login to View More IPC IPC(8): E02D5/34E21B21/00
Inventor 赵红专齐立斌杨利全黄欣
Owner CHINA RAILWAY 18TH BUREAU GRP CO LTD
Features
- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
Why Patsnap Eureka
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com