Special-shaped steel cofferdam

A technology of steel cofferdam and special-shaped steel, which is applied in construction, infrastructure engineering, etc., can solve problems such as large contact area, poor sealing, and insufficient rigidity

Inactive Publication Date: 2013-04-17
RAILWAY NO 10 ENG GRP CO LTD
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] For riverbeds with a large drop or a large difference in elevation between the two banks, the traditional method is to level the riverbed or adopt special-shaped steel cofferdams with high and low edge angles, but the high edge angle part is double-wall closed, and the low edge angle part is single-wall The high and low edge angles are adjusted by the height difference of the bottom joint cofferdam through a single-layer steel plate; the high edge angle part has a large contact area with the river bed, so the sealing is not good; the low edge angle part is due to its single layer Layer steel plate, which is not rigid enough for uneven and hard rock

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Special-shaped steel cofferdam
  • Special-shaped steel cofferdam
  • Special-shaped steel cofferdam

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present invention will be further described below in conjunction with accompanying drawing.

[0037] 1. For the special-shaped steel cofferdam of the 1# pier of Shaoguan Zhenjiang Bridge:

[0038] Such as figure 1 As shown, according to the layout of the pile foundation of the 1# main pier of Shaoguan Zhenjiang Bridge and the shape of cap 5, the steel cofferdam is designed as a rectangular open double-wall structure, that is, steel cofferdam 17, consisting of downstream side 1, Ganzhou side 2, Shaoguan side 3 and upstream side 4 are composed, the outer wall of the rectangle is 17m×17m, the inner wall of the rectangle is 15m×15m, the compartment width is 1m, and the inner frame is reinforced by ∠75×75×8mm angle steel connection; the so-called open is double The compartment formed by the wall is open, that is, the compartment is connected up and down, and concrete can be poured inward.

[0039] Such as figure 2 , 3 As shown, the wall thickness from the top of the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
bearing capacityaaaaaaaaaa
heightaaaaaaaaaa
Login to View More

Abstract

The invention discloses a special-shaped steel cofferdam applied to bridge pier and abutment foundation construction of a complex riverbed terrain. The special-shaped steel cofferdam comprises a steel cofferdam (17); the peripheral lower end of the steel cofferdam (17) is special-shaped; and after the steel cofferdam (17) is laid down and arranged in place, the peripheral lower end of the steel cofferdam (17) is matched and fully contacted with the riverbed terrain. The lower end of the periphery of the steel cofferdam (17) with an open type double-wall structure has a basil (8) with a double-wall open type. The steel cofferdam improves sealing property and stiffness of the bottom of the steel cofferdam, the steel cofferdam can reduce the gap between the steel cofferdam and the riverbed as much as possible, does not need disassembly treatment such as blast and the like on irregular limestone at the bottom of the riverbed at the early stage, even can allow difficultly-cleared boulder stones on the riverbed, reduces the steel cofferdam project number and the work amount of bottom sealing concrete, is economic and practical, and ensures the realization of the construction period and the safety goal.

Description

technical field [0001] The invention mainly relates to a cofferdam used in the construction of bridge pier foundations on river beds, in particular to a special-shaped steel cofferdam used in the construction of bridge pier foundations in complex river bed terrains. Background technique [0002] Shaoguan Zhenjiang Bridge (center mileage DK179+951.508) is a key control project of the ZQ-3 bid of the newly-built Ganshao Railway Project. It is located in Shaoguan City, Guangdong Province and crosses the Zhenjiang River in Shaoguan City. The navigable level is VII, and the design navigable clear height 4.5m, side height 2.8m, navigable clear width 66m, upper bottom width 61m, highest navigable water level 57.88m, full bridge length 270.165m, span arrangement of (44+72+44)m prestressed concrete continuous beam and 3 -32m simply supported T-beam. The bridge has 5 piers and 2 bridges in total. Piers 1# to 4# are all located in the channel of the Zhenjiang River. They all use Φ1.5m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D19/04
Inventor 杨基好闫志宇杜彪
Owner RAILWAY NO 10 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products