Multi-parameter real-condition monitoring method for well completion of underground perforator
Patent Information
- Authority / Receiving Office
- CN Β· China
- Current Assignee / Owner
- ZHONGBEI UNIV
- Publication Date
- 2011-05-04
- Estimated Expiration
- Not applicable Β· inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
1. Technical field
[0001] The multi-parameter real-time monitoring method of downhole perforator well completion disclosed by the present invention belongs to the field of downhole measurement technology of petroleum, natural gas, coal bed methane, etc., and specifically relates to a kind of downhole perforator testing during perforation or / and high-energy gas fracturing A multi-parameter real-time monitoring method for its completion effect. 2. Background technology
[0002] Perforating and fracturing are among the major completion processes that open up reservoirs to allow formation fluids to flow into the well. Whether the perforation fracturing process is reasonable or not directly affects the level of oil production and the safety of perforation operations. The perforating bombs and fracturing charges used in perforating devices and high-energy gas fracturing contain high-energy materials such as explosives and gunpowder. If the formula, process and detonation sequence...