Online monitoring system of CTCS-3 grade train control system
A monitoring system and train control system technology, applied in the field of train control, can solve the problems of not being able to record physical layer security layer data interaction, and not being able to monitor wireless communication data and operating conditions in real time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] In Embodiment 1, the online monitoring system 4 is connected between the RBC ISDN server 22 and the first impedance converter 23 through a three-way connector 41 . Specifically, the three-way coupler 41 is connected to the network cable 24 , and the online monitoring system 4 is connected to the three-way coupler 41 . The network cable 24 is used to connect the RBC ISDN server 22 and the first impedance converter 23, thus making the RBC I FIX The data of the interface is sent all the way to the first impedance converter 23 (referred to as the original I FIX interface line), all the way to the online monitoring system 4 (called monitoring line).
[0050] The online monitoring system 4 may include: a high-resistance isolation box 42 , a collection box 43 , a monitoring device 44 , and a monitoring system server 45 .
[0051] Wherein, the high-resistance isolation box 42 is connected to the three-way connector 41 and is used to isolate the online monitoring system 4 and ...
Embodiment 2
[0079]In the second embodiment, the online monitoring system 5 is connected between the first impedance converter 23 and the GSM-R network 3 through a three-way connector 51 . Specifically, the three-way coupler 51 is connected to the coaxial cable 25 , and the online monitoring system 5 is connected to the three-way coupler 51 . The coaxial cable 25 is used to connect the first impedance converter 23 and the GSM-R network 3, thus making the I of the RBC FIX The data of interface, after the first impedance converter 23, is sent to GSM-R network 3 (being called former I) all the way. FIX interface line), all the way to the online monitoring system 5 (called monitoring line).
[0080] The online monitoring system 5 may include: a second impedance transformer 52 , an acquisition box 53 , a monitoring device 54 , and a monitoring system server 55 .
[0081] Wherein, the second impedance converter 52 is connected to the three-way connector 51 to prevent line mismatch.
[0082] c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com