Technology for manufacturing rubber floor covering
A technology of rubber flooring and manufacturing process, which is applied in the fields of flame-retardant, environment-friendly rubber floor coverings, low-smoke, and halogen-free manufacturing, and can solve problems such as endangering the health of operators, unguaranteed formula ratios, and dust pollution in the working environment. , achieve the effect of saving manpower, shortening the mixing time and improving the mixing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0024] Example 1
[0025] The rubber floor covering manufacturing process includes the following steps:
[0026] (1) Ingredients sub-packaging: divide the ingredients according to the feeding order into: No. 1, No. 2 and No. 3 components, and divide the No. 1 component into: 1A, 1B and 1C Points, the 1C component is synthetic rubber;
[0027] (2) Banburying: Put 1A component into the powder barrel and put it into the bottom of the mixing chamber. Pack 1B component with EVA plastic bag, put it in the middle of the mixing chamber, and put 1C component The top of the mixing chamber; separately encapsulate the No. 2 component and No. 3 component in an EVA bag; put in the 1A component, set the temperature of the mixing chamber to the ambient temperature, and set the host current of the mixing chamber to 150A, working After 8 minutes, put in No. 2 component, set the mixing room temperature to 85°C, and set the host current of the mixing room to 80A. After working for 3 minutes, put in No...
Example Embodiment
[0035] Example 2
[0036] The rubber floor covering manufacturing process includes the following steps:
[0037] (1) Ingredients sub-packaging: divide the ingredients according to the feeding order into: No. 1, No. 2 and No. 3 components, and divide the No. 1 component into: 1A, 1B and 1C Points, the 1C component is synthetic rubber;
[0038] (2) Banburying: Put 1A component into the powder barrel and put it into the bottom of the mixing chamber. Pack 1B component with EVA plastic bag, put it in the middle of the mixing chamber, and put 1C component The top of the mixing chamber; separately encapsulate the No. 2 and No. 3 components in an EVA bag; put in the 1A component, set the temperature of the mixing chamber to the ambient temperature, and set the host current of the mixing chamber to 230A, working After 18 minutes, put in No. 2 component, set the mixing room temperature to 95℃, and set the host current of the mixing room to 150A. After working for 1 minute, put in No. 3 compo...
Example Embodiment
[0046] Example 3
[0047] The rubber floor covering manufacturing process includes the following steps:
[0048] (1) Ingredients sub-packaging: divide the ingredients according to the feeding order into: No. 1, No. 2 and No. 3 components, and divide the No. 1 component into: 1A, 1B and 1C Points, the 1C component is synthetic rubber;
[0049] (2) Banburying: Put 1A component into the powder barrel and put it into the bottom of the mixing chamber. Pack 1B component with EVA plastic bag, put it in the middle of the mixing chamber, and put 1C component The top of the mixing chamber; separately encapsulate the No. 2 and No. 3 components in an EVA bag; put in the 1A component, set the temperature of the mixing chamber to the ambient temperature, and set the host current of the mixing chamber to 200A, working After 8-18 minutes, put in No. 2 component, set the mixing room temperature to 90℃, and set the main machine current of the mixing room to 100A. After working for 2 minutes, put in ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap