A technology of measuring device and high-voltage electric energy, applied in the direction of measuring device, measuring electrical variable, measuring time integration, etc., can solve the problems of high single-stage withstand voltage, low single-stage withstand voltage, fault expansion, etc. Inrush current, the effect of reducing power consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as figure 1 As shown, this embodiment is a single-phase high-voltage electric energy metering device for a voltage level of 10kV, including a current transformer 10, a high-voltage voltage divider 20, a high-voltage capacitor 30, a high-voltage fuse 40, a metering process and a power supply circuit 50, Optical fiber communication transceiver 60, first terminal 1, second terminal 2 and housing 80, wherein:
[0038] a. The first electrode 41 of the high-voltage fuse of the high-voltage fuse 40 is connected to the second terminal 2, and the second electrode of the high-voltage fuse
[0039] 42 are respectively connected to the first electrode 31 of the high voltage capacitor of the high voltage capacitor 30 and the first electrode 21 of the high voltage divider of the high voltage divider 20 .
[0040] b. Metering processing and power supply circuit 50 includes five electronic circuits including electric energy metering circuit 51, data processing circuit 52, sto...
Embodiment 2
[0060] Such as Figure 5 As shown, in this embodiment, there are two single-phase high-voltage electric energy metering devices as described in the first embodiment, and their second terminal 2 and the second metal flange 84 are connected back to back, and the second The terminals 2 are respectively connected to the B phase of the power system, the current input terminals 11 of the two single-phase high-voltage electric energy metering devices are respectively connected to the A phase and C phase input terminals of the power system, and the two first terminals 1 are respectively used as the A phase And the outgoing line of phase C is connected to the electrical equipment. The optical fiber transceivers of the two single-phase high-voltage electric energy metering devices are connected to each other through two optical fibers, and the data processing circuit 52 performs the summation of the electric energy collected by the two single-phase high-voltage electric energy meter...
Embodiment 3
[0064] Such as Image 6 As shown, in this embodiment, there are three single-phase high-voltage electric energy metering devices as described in the first embodiment, and the second terminals 2 of the three devices are connected to each other and the third terminal 3 is connected to the power system. N-phase. The current transformer 10 adopts a through-type current transformer. The A, B, and C three-phase cables of the power system first pass through the middle through holes of the three current transformers 10 respectively, and then connect with the respective first terminal 1, and then Connect to powered equipment.
[0065] In addition, a base is provided, and the second metal flanges 84 of the three single-phase high-voltage electric energy metering devices are respectively fixed on the base.
[0066] The optical fiber transceivers 60 of the three single-phase high-voltage electric energy metering devices are connected to each other in a ring topology through two ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com