Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Comprehensive geological prediction method for karst tunnel construction

A technology for tunnel construction and geological prediction, applied in surveying, earthwork drilling, mining equipment, etc., can solve the problems of increased input cost, delay in construction period, and high insecurity factor, and achieve reasonable design, proper connection arrangement, and mutual relationship. clear effect

Active Publication Date: 2012-01-18
NO 1 ENG LIMITED OF CR20G
View PDF3 Cites 66 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the actual geological forecasting, the comprehensive geological forecasting methods selected by each construction unit are different. As for which geological forecasting methods should be used at the same time in the actual construction, which forecasting method should be the main method, and which one should be selected There is no systematic, reasonable and standard construction reference basis for the relationship between various forecasting and forecasting methods.
Therefore, in actual construction, there are often many problems such as improper selection of geological prediction methods, inability to accurately and timely predict karst problems, repeated verifications, and unavoidable geological problems in the construction process due to local prediction and prediction reasons, etc. At the same time, it caused construction problems such as delays in the construction period, increased input costs, high unsafe factors, and high construction safety risks, especially for construction areas such as the Longlinguan Tunnel on the Yiwan Railway with complex geology and difficult construction. For tunnel construction, the existing comprehensive geological prediction methods cannot meet the actual construction needs.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Comprehensive geological prediction method for karst tunnel construction
  • Comprehensive geological prediction method for karst tunnel construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] Such as figure 1 A comprehensive geological prediction method for karst tunnel construction shown, comprising the following steps:

[0037] Step 1. Long-distance detection: During the tunnel excavation construction process, a conventional long-distance advanced geological prediction system is used to carry out long-distance prediction and prediction for the entire tunnel construction from front to back, and record the long-distance prediction and prediction results simultaneously; And each time a long-distance forecast is performed, the long-distance advanced geological forecast system is used to perform long-distance detection of the geological conditions in front of the tunnel face.

[0038] The detection range of the long-distance advanced geological prediction system is the long-distance detection area within the range of 100m-150m in front of the tunnel face.

[0039] In this embodiment, the long-distance advanced geological prediction system is the TSP203 advance...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Depthaaaaaaaaaa
Login to View More

Abstract

The invention discloses a comprehensive geological prediction method for karst tunnel construction, which includes the following steps: (1) long-distance detection; (2) geological radar detection: on the basis of the long-distance detection, adopting a geological radar to review a long-distance prediction result within a short-distance detection range; (3) adopting a horizontal protruded drill hole to carry out direct detection according to a review result; and (4) supplementary protruded blasthole detection: when a direct detection result is that a geologically abnormal body exists in the current tunneling construction area, a protruded blasthole needs to be adopted to carry out supplementary detection, and a supplementary detection result is used as supplementary detection data for the direct horizontal protruded drill hole detection result. The design of the comprehensive geological prediction method is rational, the comprehensive geological prediction method is easy and convenient to operate, and is highly operable, moreover, the mutual relation among a variety of chosen prediction methods is clear, the comprehensive detection effect is good, and the invention provides a systematic, rational and standard comprehensive prediction method for karst tunnel construction.

Description

technical field [0001] The invention relates to a geological prediction method for tunnel construction, in particular to a comprehensive geological prediction method for karst tunnel construction. Background technique [0002] The problem of karst is a major problem in tunnel engineering. The impact of karst on tunnel engineering is mainly manifested in deformation and instability around the tunnel, which often leads to local collapse, falling blocks and rockfall during tunnel excavation; It not only affects the construction safety, but also directly endangers the safety of personnel and mechanical equipment. The tunnels built in the west and southwest of my country often encounter karst problems. Karst areas are generally characterized by undulating topography, and water basins are easy to form in low-lying places. The long-term dissolution and erosion of surface water forms karst depressions or valleys of various shapes. The repeated circulation of surface water and ground...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21F17/18E21B47/00
Inventor 王作举薛俊峰吴应明吴信军侯韧罗宗帆王小兵
Owner NO 1 ENG LIMITED OF CR20G
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products