Well completion method
A technology for oil wells and reservoirs, applied in the development and completion of oil-producing layers, can solve the problems of reducing permeability, reducing oil well productivity, increasing construction value and time, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0058] The oil well 1 provided with the wellhead 2 is equipped with additional equipment, so as to implement the initial development project of the oil production layer 5 . Oil well 1 li is filled with flushing liquid 4 earlier.
[0059] Wellhead 2 is installed with universal and ram type ( figure 1 ) of the blowout preventer (3) to prevent various reservoir fluids from spraying out, and the manifold is installed with a throttle valve ( figure 1 ) in order to be able to adjust the flow intensity of the flushing fluid flowing from the oil well 1 during the excavation operation of the oil well 1 .
[0060] The wellhead 2 is additionally equipped with an anti-rotation device ( image 3 ), so that it can be used to seal the downhole equipment (drill string) 10 and the wall near the wellhead 2 in the oil well 1 during the excavation operation of the oil well 1 .
[0061] The downhole equipment (drill string) 10 is provided with check valves (not shown). The check valve is insta...