Method for preparing freeze-dried preparation of combretastatin A4 disodium phosphate
A technology of compredin disodium phosphate and freeze-dried preparations, which is applied in freeze-dried transportation, medical preparations containing active ingredients, pharmaceutical formulas, etc., to achieve the effect of plump appearance and stable quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] Weigh 50g of CA4P, add water for injection to dissolve, add 0.02% activated carbon and let stand for adsorption for 30 minutes, use 0.45μm composite cellulose microporous filter membrane for coarse filtration, add water for injection to dilute to 1000ml, shake well, and then use 0.22μm composite cellulose Fine filter with a cellulose microporous membrane to detect the concentration of CA4P; divide the fine filtrate into 7ml brown vials. Further process the medicine, pre-freezing: take 120 minutes to cool down from room temperature to -45~-60°C, and then keep it for 240 minutes; primary drying: take 240 minutes to raise the final temperature of step a to -5°C, then keep it at 450 Minutes, the vacuum degree is controlled at 10 Pa; Secondary drying: First, adjust the final temperature of the primary drying to a temperature of -5°C to 10°C in 180 minutes and keep it for 210 minutes; then, use 60 minutes to keep it for 150 minutes Adjust the temperature to 10 ℃ ~ 30 ℃, keep ...
Embodiment 2
[0036]Weigh 100g of CA4P, add water for injection to dissolve, add 0.05% activated carbon and let it stand for adsorption for 30 minutes, use a 0.45μm composite cellulose microporous filter membrane for coarse filtration, add water for injection to make up to 1000ml, shake well, and then use 0.22μm composite cellulose Fine filter with a cellulose microporous membrane to detect the concentration of CA4P; divide the fine filtrate into 7ml brown vials. Further processing of the medicine, pre-freezing: take 180 minutes to cool from room temperature to -50°C, and then keep it for 180 minutes; primary drying: take 180 minutes, raise the final temperature of step a to -5°C, keep it for 420 minutes, vacuum The temperature is controlled at 10 Pa; Secondary drying: First, adjust the final temperature of the primary drying to -5°C ~ 10°C in 180 minutes, and keep it for 210 minutes; then, use 60 minutes to adjust the temperature for 180 minutes To 10 ℃ ~ 30 ℃, keep for 180 minutes, the va...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More